2-16
CABLE ROUTING DIAGRAM
1.
Ignition coil lead
2.
Clamp
3.
CDI magneto lead
4.
Neutral switch lead
5.
Radiator breather hose
6.
YPVS breather hose
7.
Connector cover
A.
Clamp the ignition coil lead to
the frame at its locating tape.
Clamp it in front of the radiator
fitting boss.
B.
Clamp the CDI magneto lead to
the frame at its locating tape.
Clamp it at the rear of the radia-
tor fitting boss.
C.
Do not allow the neutral switch
lead to slacken except over the
radiator hose.
D.
Pass the neutral switch lead
through the holder.
E.
Pass the radiator breather hose
outside the engine bracket and
inside the down tube. Then pass
the radiator breather hose inside
the CDI magneto lead.
F.
Clamp the CDI magneto lead,
radiator breather hose, YPVS
breather hose and neutral
switch lead to the frame.
Summary of Contents for yz250 2015
Page 4: ......
Page 12: ...1 2 LOCATION OF IMPORTANT LABELS EUROPE ...
Page 13: ...1 3 LOCATION OF IMPORTANT LABELS AUS NZ ZA ...
Page 62: ...3 18 CHASSIS ...
Page 153: ...5 40 REAR SHOCK ABSORBER 7 Tighten Bolt air filter joint 1 ...
Page 174: ...PRINTED IN JAPAN E PRINTED ON RECYCLED PAPER ...