4-30
KICK SHAFT AND SHIFT SHAFT
8. Install:
• Shift pedal "1"
• Bolt (shift pedal) "2"
Install the shift pedal so that the top of
the shift pedal outer diameter "a" is
highest without exceeding the line "b"
connecting the center of the shift
shaft and bottom of the screw [crank-
case cover (left)] "3".
Bolt (shift pedal):
12 Nm (1.2 m•kg, 8.7
ft•lb)
Summary of Contents for yz250 2015
Page 4: ......
Page 12: ...1 2 LOCATION OF IMPORTANT LABELS EUROPE ...
Page 13: ...1 3 LOCATION OF IMPORTANT LABELS AUS NZ ZA ...
Page 62: ...3 18 CHASSIS ...
Page 153: ...5 40 REAR SHOCK ABSORBER 7 Tighten Bolt air filter joint 1 ...
Page 174: ...PRINTED IN JAPAN E PRINTED ON RECYCLED PAPER ...