2
Installation
2-5
4
Secure the robot main body firmly.
Secure the robot main body firmly with the four hex socket head bolts as shown in the Fig. below.
WhEn InSTallIng ThE RObOT, bE SURE TO USE ThE SPECIfIED SIzE anD qUanTITy Of bOlTS ThaT MaTCh ThE DEPTh
Of TaPPED hOlES In ThE InSTallaTIOn baSE, anD SECUREly TIghTEn ThE bOlTS TO ThE CORRECT TORqUE. If ThE
bOlTS aRE nOT TIghTEnED CORRECTly, ThE RObOT MIghT fall OvER DURIng OPERaTIOn CaUSIng a SERIOUS
aCCIDEnT.
Tightening torque
Robot Model
Bolts Used
Tightening torque
YK250XGC(P), YK350XGC(P), YK400XGC(P), YK500XGLC(P), YK600XGLC(P)
M8
37Nm (380kgfcm)
Depth of tapped holes in installation base:
Iron installation base
: Bolt diameter × 1.5 or more
Aluminum installation base Bolt diameter × 3.0 or more
Recommended bolt
: JIS B 1176 hex socket head bolt, or equivalent
Strength class JIS B 1051 12.9, or equivalent
Installing the robot
Installation base
Hex socket head bolt
23230-HM-00
Summary of Contents for YK250XGC
Page 2: ......
Page 6: ......
Page 8: ......
Page 34: ......
Page 36: ......
Page 40: ......
Page 42: ......
Page 46: ......
Page 48: ......
Page 70: ......
Page 72: ......
Page 77: ...Chapter 4 Periodic inspecition Contents 1 List of inspection items 4 1 ...
Page 78: ......
Page 82: ......
Page 95: ......