5-9
E
POWR
EXHAUST PIPES 1 AND 2
EXPLODED DIAGRAM
Step
Procedure/Part name
Q’ty
Service points
7
Bolt
1
NOTE:
Tighten the bolts in the sequence indicated.
8
Bolt
1
9
Bolt
2
10
Collar
1
7
10
9
8
É
È
6th
15 N • m (1.5 kgf • m, 11 ft • Ib)
2nd 2.0 N • m (0.2 kgf • m, 1.4 ft • Ib)
10th 39 N • m (3.9 kgf • m, 28 ft • Ib)
10
×
35 mm
5th
15 N • m (1.5 kgf • m, 11 ft • Ib)
1st
2.0 N • m (0.2 kgf • m, 1.4 ft • Ib)
9th
39 N • m (3.9 kgf • m, 28 ft • Ib)
10
×
35 mm
8th
15 N • m (1.5 kgf • m, 11 ft • Ib)
4th
2.0 N • m (0.2 kgf • m, 1.4 ft • Ib)
12th 39 N • m (3.9 kgf • m, 28 ft • Ib)
10
×
45 mm
7th
15 N • m (1.5 kgf • m, 11 ft • Ib)
3rd
2.0 N • m (0.2 kgf • m, 1.4 ft • Ib)
11th 39 N • m (3.9 kgf • m, 28 ft • Ib)
10
×
40 mm
LT
242
LT
242
LT
572
LT
LT
572
LT
LT
242
LT
242
LT
242