8-33
E
HULL
HOOD
EXHAUST SYSTEM
EXPLODED DIAGRAM
Step
Procedure/Part name
Q’ty
Service points
15
Hose clamp 2
1
16
Water tank
1
17
Rubber hose
1
18
Plate
1
Reverse the removal steps for installation.
3
1
2
6
7
9
8
5
4
14
13
15
18
17
12
11
16
10
F1K
3.7 N • m (0.37 kgf • m, 2.7 ft • Ib)
5.4 N • m (0.54 kgf • m, 3.9 ft • Ib)
3.7 N • m (0.37 kgf • m, 2.7 ft • Ib)
3.7 N • m (0.37 kgf • m, 2.7 ft • Ib)
2nd 2.4 N • m (0.24 kgf • m, 1.7 ft • Ib)
1st 2.4 N • m (0.24 kgf • m, 1.7 ft • Ib)
2nd 2.4 N • m (0.24 kgf • m, 1.7 ft • Ib)
1st 2.4 N • m (0.24 kgf • m, 1.7 ft • Ib)