2-22
G Route the carburetor air vent
hose and carburetor over flow
hose through the guide.
H Route the clutch cable through
the cable guide.
I Route the brake hose and speed-
ometer cable through the cable
guide.
J Fasten the brake hose and spee-
dometer cable to the front fork
outer tube with a cable holder.
CABLE ROUTING
SPEC
Summary of Contents for TW125 1999
Page 1: ......
Page 2: ......
Page 8: ......
Page 9: ...GEN INFO 1 ...
Page 11: ......
Page 19: ...GEN INFO ...
Page 20: ...SPEC 2 ...
Page 22: ......
Page 47: ...CHK ADJ 3 ...
Page 49: ......
Page 89: ...CHK ADJ ...
Page 90: ...ENG 4 ...
Page 94: ......
Page 162: ...ENG ...
Page 163: ...CARB 5 ...
Page 165: ......
Page 174: ...CHAS 6 ...
Page 236: ...CHAS ...
Page 237: ...ELEC 7 ...
Page 239: ......
Page 274: ...TRBL SHTG 8 ...
Page 276: ......
Page 282: ...TRBL SHTG ...