CRANKSHAFT
5-67
EAS24390
CHECKING THE CYLINDER AND PISTON
1. Check:
●
Piston wall
●
Cylinder wall
Vertical scratches
→
Replace the cylinder,
and replace the piston and piston rings as a
set.
2. Measure:
●
Piston-to-cylinder clearance
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a. Measure cylinder bore “C” with the cylinder
bore gauge.
TIP
Measure cylinder bore “C” by taking side-to-side
and front-to-back measurements of the cylinder.
Then, find the average of the measurements.
b. If out of specification, replace the cylinder,
and replace the piston and piston rings as a
set.
c. Measure piston skirt diameter “P” with the mi-
crometer.
d. If out of specification, replace the piston and
piston rings as a set.
e. Calculate the piston-to-cylinder clearance
with the following formula.
f. If out of specification, replace the cylinder,
and the piston and piston rings as a set.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
EAS24430
CHECKING THE PISTON RINGS
1. Measure:
●
Piston ring side clearance
Out of specification
→
Replace the piston
and piston rings as a set.
TIP
Before measuring the piston ring side clearance,
eliminate any carbon deposits from the piston
ring grooves and piston rings.
Bore
65.500
–
65.510 mm
(2.5787
–
2.5791 in)
Wear limit
65.56 mm (2.5811 in)
Taper limit
0.050 mm (0.0020 in)
Out of round limit
0.050 mm (0.0020 in)
“C” = maximum of D
1
–
D
6
“T” = maximum of D
1
or D
2
- maximum of D
5
or D
6
“R” = maximum of D
1
, D
3
or D
5
- minimum of D
2
, D
4
or
D
6
Piston size “P”
Standard
65.475
–
65.490 mm
(2.5778
–
2.5783 in)
a. 5 mm (0.20 in) from the bottom edge of the piston
Piston-to-cylinder clearance =
Cylinder bore
“
C
”
-
Piston skirt diameter
“
P
”
Piston-to-cylinder clearance
0.010
–
0.035 mm
(0.0004
–
0.0014 in)
Summary of Contents for FZ6RC
Page 1: ...SERVICE MANUAL FZ6RY C 2009 36P 28197 10 LIT 11616 22 77 ...
Page 2: ......
Page 8: ......
Page 54: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27 EAS20410 LUBRICATION DIAGRAMS 1 5 3 2 4 ...
Page 56: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29 3 7 8 2 1 4 6 5 ...
Page 58: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 3 6 5 1 2 4 ...
Page 60: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 33 1 2 4 5 3 ...
Page 62: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35 3 2 5 4 1 ...
Page 64: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37 2 3 1 ...
Page 65: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 38 1 Main axle 2 Drive axle 3 Oil pipe ...
Page 66: ...COOLING SYSTEM DIAGRAMS 2 39 EAS20420 COOLING SYSTEM DIAGRAMS 1 1 2 2 3 5 6 4 4 7 ...
Page 68: ...CABLE ROUTING 2 41 EAS20430 CABLE ROUTING ...
Page 70: ...CABLE ROUTING 2 43 ...
Page 72: ...CABLE ROUTING 2 45 ...
Page 74: ...CABLE ROUTING 2 47 ...
Page 76: ...CABLE ROUTING 2 49 ...
Page 78: ...CABLE ROUTING 2 51 ...
Page 80: ...CABLE ROUTING 2 53 ...
Page 82: ...CABLE ROUTING 2 55 ...
Page 84: ...CABLE ROUTING 2 57 ...
Page 86: ...CABLE ROUTING 2 59 ...
Page 88: ...CABLE ROUTING 2 61 ...
Page 90: ...CABLE ROUTING 2 63 ...
Page 92: ...CABLE ROUTING 2 65 ...
Page 94: ...CABLE ROUTING 2 67 ...
Page 96: ...CABLE ROUTING 2 69 ...
Page 98: ...CABLE ROUTING 2 71 ...
Page 100: ...ADJUSTING THE HEADLIGHT BEAMS 3 29 REPLACING THE HEADLIGHT BULBS 3 30 ...
Page 196: ...CHAIN DRIVE 4 64 ...
Page 244: ...OIL PUMP 5 46 1 2 ...
Page 308: ...AIR INDUCTION SYSTEM 7 11 EAS27040 AIR INDUCTION SYSTEM 1 2 3 4 5 2 3 6 ...
Page 315: ......
Page 316: ...IGNITION SYSTEM 8 1 EAS27090 IGNITION SYSTEM EAS27110 CIRCUIT DIAGRAM ...
Page 320: ...ELECTRIC STARTING SYSTEM 8 5 EAS27160 ELECTRIC STARTING SYSTEM EAS27170 CIRCUIT DIAGRAM ...
Page 326: ...CHARGING SYSTEM 8 11 EAS27200 CHARGING SYSTEM EAS27210 CIRCUIT DIAGRAM ...
Page 327: ...CHARGING SYSTEM 8 12 1 AC magneto 2 Rectifier regulator 3 Battery 4 Main fuse ...
Page 329: ...CHARGING SYSTEM 8 14 ...
Page 330: ...LIGHTING SYSTEM 8 15 EAS27240 LIGHTING SYSTEM EAS27250 CIRCUIT DIAGRAM ...
Page 333: ...LIGHTING SYSTEM 8 18 ...
Page 334: ...SIGNALING SYSTEM 8 19 EAS27270 SIGNALING SYSTEM EAS27280 CIRCUIT DIAGRAM ...
Page 340: ...COOLING SYSTEM 8 25 EAS27300 COOLING SYSTEM EAS27310 CIRCUIT DIAGRAM ...
Page 343: ...COOLING SYSTEM 8 28 ...
Page 344: ...FUEL INJECTION SYSTEM 8 29 EAS27330 FUEL INJECTION SYSTEM EAS27340 CIRCUIT DIAGRAM ...
Page 382: ...FUEL PUMP SYSTEM 8 67 EAS27550 FUEL PUMP SYSTEM EAS27560 CIRCUIT DIAGRAM ...
Page 385: ...FUEL PUMP SYSTEM 8 70 ...
Page 386: ...ELECTRICAL COMPONENTS 8 71 EAS27970 ELECTRICAL COMPONENTS 2 1 3 4 5 6 10 8 9 11 7 12 13 14 15 ...
Page 388: ...ELECTRICAL COMPONENTS 8 73 2 1 3 4 5 6 10 8 9 7 11 12 13 ...
Page 390: ...ELECTRICAL COMPONENTS 8 75 EAS27980 CHECKING THE SWITCHES 7 8 9 12 11 14 10 4 1 2 3 5 6 13 ...
Page 410: ...ELECTRICAL COMPONENTS 8 95 ...
Page 417: ......
Page 418: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...
Page 419: ...FZ6RY C 2009 WIRING DIAGRAM XJ6N 2009 SCHÉMA DE CÂBLAGE FZ6RY C A W D 09 1 22 9 55 ページ 1 ...
Page 420: ...FZ6RY C 2009 WIRING DIAGRAM XJ6N 2009 SCHÉMA DE CÂBLAGE FZ6RY C A W D 09 1 22 9 55 ページ 2 ...