FRONT WHEEL
4-10
TIP
Start with the lightest weight.
b. Turn the front wheel 90
°
so that the heavy
spot is positioned as shown.
c. If the heavy spot does not stay in that posi-
tion, install a heavier weight.
d. Repeat steps (b) and (c) until the front wheel
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
is balanced.
4. Check:
●
Front wheel static balance
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a. Turn the front wheel and make sure it stays at
each position shown.
b. If the front wheel does not remain stationary
at all of the positions, rebalance it.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
EAS22000
INSTALLING THE FRONT WHEEL
The following procedure applies to both of the
brake discs.
1. Lubricate:
●
Wheel axle
●
Oil seal lips
2. Install:
●
Collar
●
Wheel axle
TIP
Install the tire and wheel with the mark “1” point-
ing in the direction of wheel rotation.
3. Tighten:
●
Wheel axle
●
Wheel axle pinch bolt
NOTICE
ECA20S1004
Before tightening the wheel axle, push down
hard on the handlebar(s) several times and
check if the front fork rebounds smoothly.
4. Install:
●
Brake calipers
WARNING
EWA13490
Make sure the brake cable is routed properly.
Recommended lubricant
Lithium-soap-based grease
Wheel axle
65 Nm (6.5 m·kgf, 46 ft·lbf)
Wheel axle pinch bolt
19 Nm (1.9 m·kgf, 14 ft·lbf)
Front brake caliper bolt
40 Nm (4.0 m·kgf, 29 ft·lbf)
T
R
.
.
T
R
.
.
T
R
.
.
Summary of Contents for FZ6RC
Page 1: ...SERVICE MANUAL FZ6RY C 2009 36P 28197 10 LIT 11616 22 77 ...
Page 2: ......
Page 8: ......
Page 54: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27 EAS20410 LUBRICATION DIAGRAMS 1 5 3 2 4 ...
Page 56: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29 3 7 8 2 1 4 6 5 ...
Page 58: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 3 6 5 1 2 4 ...
Page 60: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 33 1 2 4 5 3 ...
Page 62: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35 3 2 5 4 1 ...
Page 64: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37 2 3 1 ...
Page 65: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 38 1 Main axle 2 Drive axle 3 Oil pipe ...
Page 66: ...COOLING SYSTEM DIAGRAMS 2 39 EAS20420 COOLING SYSTEM DIAGRAMS 1 1 2 2 3 5 6 4 4 7 ...
Page 68: ...CABLE ROUTING 2 41 EAS20430 CABLE ROUTING ...
Page 70: ...CABLE ROUTING 2 43 ...
Page 72: ...CABLE ROUTING 2 45 ...
Page 74: ...CABLE ROUTING 2 47 ...
Page 76: ...CABLE ROUTING 2 49 ...
Page 78: ...CABLE ROUTING 2 51 ...
Page 80: ...CABLE ROUTING 2 53 ...
Page 82: ...CABLE ROUTING 2 55 ...
Page 84: ...CABLE ROUTING 2 57 ...
Page 86: ...CABLE ROUTING 2 59 ...
Page 88: ...CABLE ROUTING 2 61 ...
Page 90: ...CABLE ROUTING 2 63 ...
Page 92: ...CABLE ROUTING 2 65 ...
Page 94: ...CABLE ROUTING 2 67 ...
Page 96: ...CABLE ROUTING 2 69 ...
Page 98: ...CABLE ROUTING 2 71 ...
Page 100: ...ADJUSTING THE HEADLIGHT BEAMS 3 29 REPLACING THE HEADLIGHT BULBS 3 30 ...
Page 196: ...CHAIN DRIVE 4 64 ...
Page 244: ...OIL PUMP 5 46 1 2 ...
Page 308: ...AIR INDUCTION SYSTEM 7 11 EAS27040 AIR INDUCTION SYSTEM 1 2 3 4 5 2 3 6 ...
Page 315: ......
Page 316: ...IGNITION SYSTEM 8 1 EAS27090 IGNITION SYSTEM EAS27110 CIRCUIT DIAGRAM ...
Page 320: ...ELECTRIC STARTING SYSTEM 8 5 EAS27160 ELECTRIC STARTING SYSTEM EAS27170 CIRCUIT DIAGRAM ...
Page 326: ...CHARGING SYSTEM 8 11 EAS27200 CHARGING SYSTEM EAS27210 CIRCUIT DIAGRAM ...
Page 327: ...CHARGING SYSTEM 8 12 1 AC magneto 2 Rectifier regulator 3 Battery 4 Main fuse ...
Page 329: ...CHARGING SYSTEM 8 14 ...
Page 330: ...LIGHTING SYSTEM 8 15 EAS27240 LIGHTING SYSTEM EAS27250 CIRCUIT DIAGRAM ...
Page 333: ...LIGHTING SYSTEM 8 18 ...
Page 334: ...SIGNALING SYSTEM 8 19 EAS27270 SIGNALING SYSTEM EAS27280 CIRCUIT DIAGRAM ...
Page 340: ...COOLING SYSTEM 8 25 EAS27300 COOLING SYSTEM EAS27310 CIRCUIT DIAGRAM ...
Page 343: ...COOLING SYSTEM 8 28 ...
Page 344: ...FUEL INJECTION SYSTEM 8 29 EAS27330 FUEL INJECTION SYSTEM EAS27340 CIRCUIT DIAGRAM ...
Page 382: ...FUEL PUMP SYSTEM 8 67 EAS27550 FUEL PUMP SYSTEM EAS27560 CIRCUIT DIAGRAM ...
Page 385: ...FUEL PUMP SYSTEM 8 70 ...
Page 386: ...ELECTRICAL COMPONENTS 8 71 EAS27970 ELECTRICAL COMPONENTS 2 1 3 4 5 6 10 8 9 11 7 12 13 14 15 ...
Page 388: ...ELECTRICAL COMPONENTS 8 73 2 1 3 4 5 6 10 8 9 7 11 12 13 ...
Page 390: ...ELECTRICAL COMPONENTS 8 75 EAS27980 CHECKING THE SWITCHES 7 8 9 12 11 14 10 4 1 2 3 5 6 13 ...
Page 410: ...ELECTRICAL COMPONENTS 8 95 ...
Page 417: ......
Page 418: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...
Page 419: ...FZ6RY C 2009 WIRING DIAGRAM XJ6N 2009 SCHÉMA DE CÂBLAGE FZ6RY C A W D 09 1 22 9 55 ページ 1 ...
Page 420: ...FZ6RY C 2009 WIRING DIAGRAM XJ6N 2009 SCHÉMA DE CÂBLAGE FZ6RY C A W D 09 1 22 9 55 ページ 2 ...