CRANKCASE
5-61
EAS25550
DISASSEMBLING THE CRANKCASE
1. Place the engine upside down.
2. Remove:
●
Crankcase bolts
TIP
●
Loosen each bolt 1/4 of a turn at a time, in stag-
es and in a crisscross pattern. After all of the
bolts are fully loosened, remove them.
●
Loosen the bolts in decreasing numerical order
(refer to the numbers in the illustration).
●
The numbers embossed on the crankcase in-
dicate the crankcase tightening sequence.
M8
×
85 mm (3.3 in) bolts: “1”
–
“7”, “10”
M8
×
115 mm (4.5 in) bolts: “8”, “9”
M8
×
65 mm (2.6 in) bolts: “11”, “12”
M6
×
65 mm (2.6 in) bolts: “13”, “14”
M6
×
55 mm (2.2 in) bolts: “15”, “22”
–
“26”
M6
×
45 mm (1.8 in) bolts: “16”, “19”, “20”
M6
×
65 mm (2.6 in) bolts: “17”, “27”
M6
×
75 mm (3.0 in) bolt: “18”
M6
×
100 mm (3.9 in) bolt: “21” (in upper side)
3. Remove:
●
Lower crankcase
NOTICE
ECA13900
Tap on one side of the crankcase with a
soft-face hammer. Tap only on reinforced
portions of the crankcase, not on the crank-
case mating surfaces. Work slowly and care-
fully and make sure the crankcase halves
separate evenly.
4. Remove:
●
Dowel pins
5. Remove:
●
Crankshaft journal lower bearing
(from the lower crankcase)
TIP
Identify the position of each crankshaft journal
lower bearing so that it can be reinstalled in its
original place.
EAS25580
CHECKING THE CRANKCASE
1. Thoroughly wash the crankcase halves in a
mild solvent.
2. Thoroughly clean all the gasket surfaces and
crankcase mating surfaces.
3. Check:
●
Crankcase
Cracks/damage
→
Replace.
●
Oil delivery passages
Obstruction
→
Blow out with compressed air.
EAS4S81034
CHECKING THE BEARINGS AND OIL SEALS
1. Check:
●
Bearings
Clean and lubricate the bearings, then rotate
the inner race with your finger.
Rough movement
→
Replace.
2. Check:
●
Oil seals
Damage/wear
→
Replace.
EAS25660
ASSEMBLING THE CRANKCASE
1. Lubricate:
●
Crankshaft journal bearings
(with the recommended lubricant)
2. Apply:
●
Sealant
(onto the crankcase mating surfaces)
TIP
Do not allow any sealant to come into contact
with the oil gallery or crankshaft journal bear-
ings. Do not apply sealant to within 2
–
3 mm of
the crankshaft journal bearings.
4
6
8
2
10
5
7
3
9
1
13
21
16
19
20
27
17
11
12
18
15
14
24
26
22
23 25
Recommended lubricant
Engine oil
Yamaha bond No. 1215
90890-85505
(Three Bond No.1215®)
Summary of Contents for FZ6RC
Page 1: ...SERVICE MANUAL FZ6RY C 2009 36P 28197 10 LIT 11616 22 77 ...
Page 2: ......
Page 8: ......
Page 54: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27 EAS20410 LUBRICATION DIAGRAMS 1 5 3 2 4 ...
Page 56: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29 3 7 8 2 1 4 6 5 ...
Page 58: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 3 6 5 1 2 4 ...
Page 60: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 33 1 2 4 5 3 ...
Page 62: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35 3 2 5 4 1 ...
Page 64: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37 2 3 1 ...
Page 65: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 38 1 Main axle 2 Drive axle 3 Oil pipe ...
Page 66: ...COOLING SYSTEM DIAGRAMS 2 39 EAS20420 COOLING SYSTEM DIAGRAMS 1 1 2 2 3 5 6 4 4 7 ...
Page 68: ...CABLE ROUTING 2 41 EAS20430 CABLE ROUTING ...
Page 70: ...CABLE ROUTING 2 43 ...
Page 72: ...CABLE ROUTING 2 45 ...
Page 74: ...CABLE ROUTING 2 47 ...
Page 76: ...CABLE ROUTING 2 49 ...
Page 78: ...CABLE ROUTING 2 51 ...
Page 80: ...CABLE ROUTING 2 53 ...
Page 82: ...CABLE ROUTING 2 55 ...
Page 84: ...CABLE ROUTING 2 57 ...
Page 86: ...CABLE ROUTING 2 59 ...
Page 88: ...CABLE ROUTING 2 61 ...
Page 90: ...CABLE ROUTING 2 63 ...
Page 92: ...CABLE ROUTING 2 65 ...
Page 94: ...CABLE ROUTING 2 67 ...
Page 96: ...CABLE ROUTING 2 69 ...
Page 98: ...CABLE ROUTING 2 71 ...
Page 100: ...ADJUSTING THE HEADLIGHT BEAMS 3 29 REPLACING THE HEADLIGHT BULBS 3 30 ...
Page 196: ...CHAIN DRIVE 4 64 ...
Page 244: ...OIL PUMP 5 46 1 2 ...
Page 308: ...AIR INDUCTION SYSTEM 7 11 EAS27040 AIR INDUCTION SYSTEM 1 2 3 4 5 2 3 6 ...
Page 315: ......
Page 316: ...IGNITION SYSTEM 8 1 EAS27090 IGNITION SYSTEM EAS27110 CIRCUIT DIAGRAM ...
Page 320: ...ELECTRIC STARTING SYSTEM 8 5 EAS27160 ELECTRIC STARTING SYSTEM EAS27170 CIRCUIT DIAGRAM ...
Page 326: ...CHARGING SYSTEM 8 11 EAS27200 CHARGING SYSTEM EAS27210 CIRCUIT DIAGRAM ...
Page 327: ...CHARGING SYSTEM 8 12 1 AC magneto 2 Rectifier regulator 3 Battery 4 Main fuse ...
Page 329: ...CHARGING SYSTEM 8 14 ...
Page 330: ...LIGHTING SYSTEM 8 15 EAS27240 LIGHTING SYSTEM EAS27250 CIRCUIT DIAGRAM ...
Page 333: ...LIGHTING SYSTEM 8 18 ...
Page 334: ...SIGNALING SYSTEM 8 19 EAS27270 SIGNALING SYSTEM EAS27280 CIRCUIT DIAGRAM ...
Page 340: ...COOLING SYSTEM 8 25 EAS27300 COOLING SYSTEM EAS27310 CIRCUIT DIAGRAM ...
Page 343: ...COOLING SYSTEM 8 28 ...
Page 344: ...FUEL INJECTION SYSTEM 8 29 EAS27330 FUEL INJECTION SYSTEM EAS27340 CIRCUIT DIAGRAM ...
Page 382: ...FUEL PUMP SYSTEM 8 67 EAS27550 FUEL PUMP SYSTEM EAS27560 CIRCUIT DIAGRAM ...
Page 385: ...FUEL PUMP SYSTEM 8 70 ...
Page 386: ...ELECTRICAL COMPONENTS 8 71 EAS27970 ELECTRICAL COMPONENTS 2 1 3 4 5 6 10 8 9 11 7 12 13 14 15 ...
Page 388: ...ELECTRICAL COMPONENTS 8 73 2 1 3 4 5 6 10 8 9 7 11 12 13 ...
Page 390: ...ELECTRICAL COMPONENTS 8 75 EAS27980 CHECKING THE SWITCHES 7 8 9 12 11 14 10 4 1 2 3 5 6 13 ...
Page 410: ...ELECTRICAL COMPONENTS 8 95 ...
Page 417: ......
Page 418: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...
Page 419: ...FZ6RY C 2009 WIRING DIAGRAM XJ6N 2009 SCHÉMA DE CÂBLAGE FZ6RY C A W D 09 1 22 9 55 ページ 1 ...
Page 420: ...FZ6RY C 2009 WIRING DIAGRAM XJ6N 2009 SCHÉMA DE CÂBLAGE FZ6RY C A W D 09 1 22 9 55 ページ 2 ...