CABLE ROUTING (FJR13A)
2-56
1. Grip warmer couplers (for optional grip warmers)
2. Handlebar switch couplers
3. Right handlebar switch lead
4. Main switch lead
5. Clutch hose
6. Left handlebar switch lead
7. Stator coil lead
8. Fuel tank breather hose (joint to rollover valve) (for
California only)
9. Air filter case breather hose
10. Gear position switch lead
11. Fuel tank breather/overflow hose (except for
California)
12. Fuel tank overflow hose (for California only)
13. Sidestand switch
14. Sidestand switch lead
15. Oil level switch lead
16. Rollover valve (for California only)
17. Fuel tank breather hose (rollover valve to canister)
(for California only)
18. Canister breather hose (for California only)
19. Canister (for California only)
20. Canister purge hose (3-way joint to canister) (for
California only)
21. Coolant reservoir breather hose
22. Brake hose (hydraulic unit to left front brake
caliper)
23. Front wheel sensor
24. Front wheel sensor lead
25. Front left turn signal light lead
26. Brake pipe (metering valve to right front brake
caliper)
27. Brake pipe (hydraulic unit to front brake calipers)
28. Brake pipe (front brake master cylinder to hydraulic
unit)
29. Wire harness
30. Crankshaft position sensor lead
31. Starter motor lead
32. Oil level switch coupler
33. Upper crankcase
34. Rear balancer cover
A. Do not connect the grip warmer couplers.
B. Secure the plastic band by inserting the projection
on the band into the hole in the windshield drive
unit/meter assembly stay, and then fasten the
handlebar switch leads with the band, making sure
that the end of the band faces down. Do not cut off
the excess end of the plastic band.
C. Route the clutch hose in front of the front fork as
shown in the illustration.
D. Secure the plastic band by inserting the projection
on the band into the hole in the windshield drive
unit/meter assembly stay, and then fasten the
handlebar switch leads and front wheel sensor
lead with the band, making sure that the end of the
band faces down. Do not cut off the excess end of
the plastic band.
E. To oil level switch
F. Fasten the leads (to oil level switch and crankshaft
position sensor) that branch off from the wire
harness to the guide on the holder with a plastic
locking tie, making sure that the end of the tie faces
upward. Do not cut off the excess end of the plastic
locking tie.
G. Fasten the sidestand switch lead, stator coil lead,
and oil level switch lead with a plastic locking tie,
making sure to bundle and fasten the sidestand
switch lead so that the coupler is positioned to the
front of the tie. Face the end of the plastic locking
tie outward. Do not cut off the excess end of the
plastic locking tie.
H. To fuel tank
I.
Route the gear position switch lead so that the
coupler is positioned as shown in the illustration.
J. Pass the fuel tank breather/overflow hose through
the guide on the universal joint dust cover.
K. Pass the air filter case breather hose through the
guide on the muffler bracket.
L. Pass the fuel tank breather hose (joint to rollover
valve) between the frame and the projection on the
air filter case as shown in the illustration. (for
California only)
M. Pass the canister purge hose (3-way joint to
canister) through the opening in the frame, to the
inside of the frame. (for California only)
N. Pass the fuel tank breather hose (joint to rollover
valve) through the cutout in the air deflector. (for
California only)
O. Route the coolant reservoir breather hose to the
outside of the fuel tank breather hose (joint to
rollover valve) and the canister purge hose (3-way
joint to canister). (for California only)
P. 43
–
53 mm (1.69
–
2.09 in)
Q. 60
–
70 mm (2.36
–
2.76 in)
R. Fasten the grommets on the front wheel sensor
lead and the brake hose (hydraulic unit to left front
brake caliper) with the holder.
S. Route the front wheel sensor lead to the outside of
the left front brake caliper lower mounting boss and
the boss for the left front fork compression
damping force adjusting screw.
T. Fasten the grommet on the front wheel sensor lead
with the holder.
U. Route the front wheel sensor lead between the left
front brake caliper and the brake hose (hydraulic
unit to left front brake caliper).
V. Fasten the front wheel sensor lead to the brake
hose (hydraulic unit to left front brake caliper) with
the two holders, making sure to position the lead to
the inside of the hose.
W. Fasten the clutch hose with the holder.
X. When installing the clutch hose onto the clutch
release cylinder, make sure that the pipe section
on the end of the hose contacts the stopper on the
cylinder body.
Y. To sidestand switch
Z. Fasten the oil level switch lead and starter motor
lead with the clamp.
AA.Face the ends of the clamp to the left, making sure
that the lower end contacts the wire harness.
AB.Route the starter motor lead between the rear
balancer cover bolt and the rib on the crankcase.
Summary of Contents for FJR13AEV(C)
Page 1: ...SERVICE MANUAL FJR13AV C FJR13AEV C LIT 11616 19 83 3P6 28197 10 ...
Page 6: ......
Page 8: ......
Page 79: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 30 ...
Page 82: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 33 EAS20410 LUBRICATION DIAGRAMS 5 6 7 1 2 3 4 ...
Page 84: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35 1 3 2 ...
Page 85: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 36 1 Main axle 2 Drive axle 3 Oil delivery pipe 1 ...
Page 86: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37 6 5 4 3 2 1 ...
Page 88: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 1 2 3 4 5 6 7 8 9 ...
Page 90: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 41 4 5 3 2 1 9 8 6 7 ...
Page 94: ...COOLING SYSTEM DIAGRAMS 2 45 A A 7 1 2 3 4 5 5 7 8 6 8 9 10 11 12 ...
Page 100: ...CABLE ROUTING FJR13A 2 51 A B C D E 1 1 2 3 4 5 6 7 8 9 11 10 12 ...
Page 102: ...CABLE ROUTING FJR13A 2 53 A B C D 1 2 3 4 6 5 7 8 9 10 11 12 ...
Page 110: ...CABLE ROUTING FJR13A 2 61 D A B B C E 1 2 3 4 ...
Page 120: ...CABLE ROUTING FJR13AE 2 71 B C 1 A D E G 1 2 3 4 5 6 7 8 9 14 13 10 11 12 15 F ...
Page 122: ...CABLE ROUTING FJR13AE 2 73 A B C D E 1 2 3 4 6 5 8 7 9 11 10 12 13 ...
Page 130: ...CABLE ROUTING FJR13AE 2 81 D B C A E E F I 3 4 5 2 1 6 H G ...
Page 136: ...CABLE ROUTING FJR13AE 2 87 ...
Page 139: ......
Page 198: ...GENERAL CHASSIS 4 11 b a 1 2 ...
Page 298: ...SHAFT DRIVE 4 111 ...
Page 321: ...CAMSHAFTS 5 20 ...
Page 434: ...BALANCERS 5 133 ...
Page 450: ...WATER PUMP 6 15 ...
Page 461: ...THROTTLE BODIES 7 10 ...
Page 462: ...AIR INDUCTION SYSTEM 7 11 EAS27040 AIR INDUCTION SYSTEM 1 2 3 4 5 1 1 1 1 2 2 5 2 3 3 4 7 8 6 ...
Page 471: ......
Page 483: ...IGNITION SYSTEM 8 12 ...
Page 499: ...ELECTRIC STARTING SYSTEM 8 28 ...
Page 501: ...CHARGING SYSTEM 8 30 2 Rectifier regulator 3 AC magneto 7 Main fuse 8 Battery ...
Page 503: ...CHARGING SYSTEM 8 32 ...
Page 527: ...COOLING SYSTEM 8 56 ...
Page 571: ...FUEL INJECTION SYSTEM 8 100 ...
Page 577: ...FUEL PUMP SYSTEM 8 106 ...
Page 583: ...WINDSHIELD DRIVE SYSTEM 8 112 ...
Page 589: ...ACCESSORY BOX SYSTEM 8 118 ...
Page 599: ...ABS ANTI LOCK BRAKE SYSTEM 8 128 ...
Page 629: ...ABS ANTI LOCK BRAKE SYSTEM 8 158 ...
Page 673: ...YCC S Yamaha Chip Controlled Shift SYSTEM FJR13AE only 8 202 ...
Page 676: ...ELECTRICAL COMPONENTS 8 205 FJR13A 1 17 16 18 19 3 2 4 5 6 7 8 9 10 11 12 13 14 15 ...
Page 678: ...ELECTRICAL COMPONENTS 8 207 FJR13AE 1 2 3 4 5 6 7 8 9 10 11 12 13 15 14 16 18 19 20 17 ...
Page 680: ...ELECTRICAL COMPONENTS 8 209 FJR13AE 1 19 18 17 20 21 3 2 4 5 6 8 7 9 10 11 12 13 14 15 16 ...
Page 717: ......
Page 718: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...