7-25
SPEC
WIRE ROUTING DIAGRAM
1
Oil level switch lead
2
Clamp
3
Oil level switch
4
Spark plug cap
5
High tension cord
6
TCI unit lead
7
Charging coil
8
Clamp
9
Charging coil lead
0
TCI unit
q
Starter motor (EF7000E/
EF7200E/EF7200DE)
w
Starter relay lead (EF7000E/
EF7200E/EF7200DE)
A
Install the grommet so that it
contact with the gray tube.
B
Route the oil level switch lead
as shown.
C
Make sure that the high ten-
sion cord is not pinched when
installing the flywheel cover.
D
Place the lead on the TCI unit
side to secure.
E
Secure the lead with the cover
installed.
F
Route the TCI unit lead
through the hole in the crank-
case.
G
Adjust the TCI unit air gap
between to 0.4–0.6 mm
(0.0157–0.0236 in) on both
sides.
H
Install the lead so that there is
no slack or pinching.
I
Install the spark plug cap in
the direction shown.
J
Screw in the high tension cord
until it touches the spark plug
cap.
ENGINE