5
CLP-265GP
1.
Music Rest Assembly
(Time required: About 1 minute)
1-1
Remove the four (4) screws marked [S13]. The music
rest assembly can then be removed. (Fig.1)
■
DISASSEMBLY PROCEDURE
[S12]: Bind Head Screw 4.0X14 MFZN2B3 (WE983100)
[S13]: Bind Head Tapping Screw-1 3.0X16 MFZN2B3 (WE971200)
(Fig.1)
[S12]
[S13]
[S12]
[S13]
Support Bar Assembly
Music Rest Assembly
Key Cover Assembly
Top Board Assembly (L)
Top Board Assembly (S)
Removal of the hinge shaft
Hinge Shafts
Remove the two (2) hinge
shafts one by one.
(Fig.2)
[S23]
Hinge Shafts
Top Board Assembly (L)
Support Bar Assembly
Support Bar Angle Assembly
[S14]
[S25]
(Fig.3)
[S14]: Bind Head Screw 5.0X50 MFZN2B3 (WJ346900)
[S23]: Bind Head Tapping Screw-1 3.5X16 MFZN2B3 (WE955100)
[S25]: Nut Hex Cap #3 M5 MFZN2B3 (WJ347000)
2.
Top Board Assembly (L)
(Time required: About 3 minutes)
2-1
Remove the two (2) hinge shafts. The top board
assembly (L) can then be removed. (Fig.2, Fig.3)
3.
Top Board Assembly (S)
(Time required: About 5 minutes)
*
Before disassembling the top board assembly (S), shut up
the key cover assembly completely to protect the key
cover assembly from being scratched.
3-1
Remove the top board assembly (L) . (See procedure 2.)
3-2
Remove the two (2) screws marked [S12]. (Fig.1)
3-3
Slide the top board assembly (S) forward and lift it.