15
CLP-120
19.
Side Cover Assembly L, R
(Time required: about 12 min for each)
*
For safety, make sure to perform by two persons.
*
To remove screws from the bottom, prepare a
worktable or bolsters to set the main unit.
19-1. Remove the top board assembly. (See Procedure 1)
19-2. Remove the key cover assembly. (See Procedure 5)
19-3. Remove the panel assembly. (See Procedure 6)
19-4. Remove the end block assembly L, R.
(See Procedure 9)
19-5. Remove the keyboard assembly. (See Procedure 12)
19-6. Remove the main unit and lay it on the worktable
or the bolsters. (See Procedure 18)
19-7. Remove the four (4) screws marked [41a] for each
side and the five (5) screws marked [52] for each side.
The side cover assembly L, R can then be removed.
(Fig.18)
[41a]
[41b]
[41c]
[40]
[40]
[41a]
[52a]
[52b]
Front Rail Assemvly
Side Cover
Assemvly
Back Top Board Assembly
Keybed Assembly
20.
Front Rail (Time required: about 12 min)
20-1. Remove the top board assembly. (See Procedure 1)
20-2. Remove the key cover assembly. (See Procedure 5)
20-3. Remove the panel assembly. (See Procedure 6)
20-4. Remove the end block assembly L, R.
(See Procedure 9)
20-5. Remove the keyboard assembly. (See Procedure 12)
20-6. Remove the seven (7) screws marked [41b] and the
two (2) screws marked [52] for each side to remove
the front rail assembly. (Fig.18)
(Fig.18)
[40]:
Bind Head Tapping Screw-1 3.5X12 MFZN2Y (EP030240)
[41a]:
Truss Head Tapping Screw-1 3.5X30 MFZN2BL (VU952600)
[41b]:
Truss Head Tapping Screw-1 3.5X30 MFZN2BL (VU952600)
[52a]:
Bind Head Tapping Screw-1 3.5X16 MFZN2Y (EP030190)
[52b]:
Bind Head Tapping Screw-1 3.5X16 MFZN2Y (EP030190)