–13–
A Clamp the throttle cables with
the holder. Position the end of
clip downword.
B Route the rear brake switch lead
under the master cylinder reser-
vor hose.
C Position the band end of right
side bracket.
D Position the steel band end to
forward.
E Position the steel band end to
right side.
CABLE ROUTING
SPEC
F Route the battery positive (+)
lead through the slit of the bat-
tery box.
G Secure the igniter unit lead and
tail brake light lead to the frame
with a clamp. Point the
open / close section to the upper
side of the vehicle.
H To the rear fender.
I Connect the wire harness to the
igniter unit through the hole of ig-
niter plate.
J Position the mark on the steel
band to forward.
K Fasten the wire harness with a
band on the tool box plate.
L Fasten the wire harness to the
frame with a plastic locking tie.
Position the locking tie front of
the holder.
M Route the wire harness outside
of the guide on the frame.
N Clamp the clutch cable and start-
er cable with a holder.
Position the end of holder down
side.
Summary of Contents for 5KSJ
Page 1: ......
Page 38: ...PRINTED IN U S A ...