–7–
CABLE ROUTING
SPEC
M Fasten the lead with locking tie
near the side cover.
N Position the all connectors inside
of the connector cover.
O Route the clutch cable through
the cable guide.
P Fasten the handlebar switch
leads (left and right) under the
handle crown with a plastic
band. Set the band at four
notches and install it no slacking.
Q Route the each hoses through the
frame guide and do not pinch it.
R When installing the fitting plate,
do not pinch the each hoses and
wireharness.
S When install the AI system push
the wire harness to space of rear-
side.
Summary of Contents for 5KSJ
Page 1: ......
Page 38: ...PRINTED IN U S A ...