6-39
HANDLEBAR
5. Install:
• Right grip "1"
• Collar "2"
Apply the adhesive on the tube guide "3".
• Before applying the adhesive, wipe off grease
or oil on the tube guide surface "a" with a lac-
quer thinner.
• Install the grip to the tube guide so that the
grip match mark "b" and tube guide slot "c"
form the angle as shown.
6. Install:
• Grip cap cover "1"
• Throttle grip "2"
Apply the lithium soap base grease on the
throttle grip sliding surface.
7. Install:
• Throttle cables "1"
To tube guide "2".
Apply the lithium soap base grease on the
throttle cable end and tube guide cable winding
portion.
8. Install:
• Throttle cable cap "1"
• Screw (throttle cable cap) "2"
After tightening the screws, check that the
throttle grip "3" moves smoothly. If it does
not, retighten the bolts for adjustment.
Screw (throttle cable cap):
4 Nm (0.4 m•kg, 2.9 ft•lb)
Summary of Contents for 2011 WR250FA
Page 6: ...YAMAHA MOTOR CORPORATION U S A WR MOTORCYCLE LIMITED WARRANTY ...
Page 10: ...MEMO ...
Page 62: ...2 22 LUBRICATION DIAGRAMS LUBRICATION DIAGRAMS ...
Page 64: ...2 24 LUBRICATION DIAGRAMS ...
Page 66: ...2 26 CABLE ROUTING DIAGRAM CABLE ROUTING DIAGRAM ...
Page 68: ...2 28 CABLE ROUTING DIAGRAM ...
Page 70: ...2 30 CABLE ROUTING DIAGRAM ...
Page 72: ...2 32 CABLE ROUTING DIAGRAM ...
Page 74: ...2 34 CABLE ROUTING DIAGRAM ...
Page 117: ...3 42 CHASSIS ...
Page 118: ...3 43 CHASSIS LUBRICATION ...
Page 123: ...3 48 ELECTRICAL Charging method using a variable voltage charger ...
Page 124: ...3 49 ELECTRICAL Charging method using a constant voltage charger ...
Page 314: ......
Page 315: ......