5-66
KICK SHAFT AND SHIFT SHAFT
CHECKING THE SHIFT SHAFT
1. Inspect:
• Shift shaft "1"
Bend/damage
→
Replace.
• Spring "2"
Broken
→
Replace.
CHECKING THE SHIFT GUIDE AND SHIFT
LEVER ASSEMBLY
1. Inspect:
• Shift guide "1"
• Shift lever "2"
• Pawl "3"
• Pawl pin "4"
• Spring "5"
Wear/damage
→
Replace.
CHECKING THE STOPPER LEVER
1. Inspect:
• Stopper lever "1"
Wear/damage
→
Replace.
• Torsion spring "2"
Broken
→
Replace.
INSTALLING THE SEGMENT
1. Install:
• Segment "1"
• Bolt (segment)
Align the notch "a" on the segment with the pin
"b" on the shift cam.
If the segment gets an impact, it may be
damaged. Take care not to give an impact to
the segment when tightening the bolt.
INSTALLING THE STOPPER LEVER
1. Install:
• Torsion spring "1"
• Stopper lever "2"
• Bolt (stopper lever) "3"
Align the stopper lever roller with the slot on
segment.
Bolt (segment):
30 Nm (3.0 m•kg, 22 ft•lb)
Bolt (stopper lever):
10 Nm (1.0 m•kg, 7.2 ft•lb)
Summary of Contents for 2011 WR250FA
Page 6: ...YAMAHA MOTOR CORPORATION U S A WR MOTORCYCLE LIMITED WARRANTY ...
Page 10: ...MEMO ...
Page 62: ...2 22 LUBRICATION DIAGRAMS LUBRICATION DIAGRAMS ...
Page 64: ...2 24 LUBRICATION DIAGRAMS ...
Page 66: ...2 26 CABLE ROUTING DIAGRAM CABLE ROUTING DIAGRAM ...
Page 68: ...2 28 CABLE ROUTING DIAGRAM ...
Page 70: ...2 30 CABLE ROUTING DIAGRAM ...
Page 72: ...2 32 CABLE ROUTING DIAGRAM ...
Page 74: ...2 34 CABLE ROUTING DIAGRAM ...
Page 117: ...3 42 CHASSIS ...
Page 118: ...3 43 CHASSIS LUBRICATION ...
Page 123: ...3 48 ELECTRICAL Charging method using a variable voltage charger ...
Page 124: ...3 49 ELECTRICAL Charging method using a constant voltage charger ...
Page 314: ......
Page 315: ......