5-29
CYLINDER HEAD
3. Install:
• Copper washer "1"
• Oil delivery pipe "2"
• Union bolt (M8) "3"
• Union bolt (M10) "4"
First tighten the union bolts temporarily.Then
retighten them with the width "a" across flats of
the oil delivery pipe held tight with a spanner.
4. Install:
• Radiator pipe "1"
• Bolt (radiator pipe) "2"
Union bolt (M8):
18 Nm (1.8 m•kg, 13 ft•lb)
Union bolt (M10):
20 Nm (2.0 m•kg, 14 ft•lb)
Bolt (radiator pipe):
10 Nm (1.0 m•kg, 7.2 ft•lb)
Summary of Contents for 2011 WR250FA
Page 6: ...YAMAHA MOTOR CORPORATION U S A WR MOTORCYCLE LIMITED WARRANTY ...
Page 10: ...MEMO ...
Page 62: ...2 22 LUBRICATION DIAGRAMS LUBRICATION DIAGRAMS ...
Page 64: ...2 24 LUBRICATION DIAGRAMS ...
Page 66: ...2 26 CABLE ROUTING DIAGRAM CABLE ROUTING DIAGRAM ...
Page 68: ...2 28 CABLE ROUTING DIAGRAM ...
Page 70: ...2 30 CABLE ROUTING DIAGRAM ...
Page 72: ...2 32 CABLE ROUTING DIAGRAM ...
Page 74: ...2 34 CABLE ROUTING DIAGRAM ...
Page 117: ...3 42 CHASSIS ...
Page 118: ...3 43 CHASSIS LUBRICATION ...
Page 123: ...3 48 ELECTRICAL Charging method using a variable voltage charger ...
Page 124: ...3 49 ELECTRICAL Charging method using a constant voltage charger ...
Page 314: ......
Page 315: ......