4 - 52
ENG
PRIMARY AND SECONDARY SHEAVES
PRIMARY AND SECONDARY SHEAVES
T
R
.
.
100 Nm (10.0 m
•
kg, 72 ft
•
lb)
T
R
.
.
10 Nm (1.0 m
•
kg, 7.2 ft
•
Ib)
T
R
.
.
10 Nm (1.0 m
•
kg, 7.2 ft
•
Ib)
T
R
.
.
10 Nm (1.0 m
•
kg, 7.2 ft
•
Ib)
T
R
.
.
120 Nm (12.0 m
•
kg, 85 ft
•
lb)
10
10
9
7
6
8
5
4
3
2
1
(12)
(7)
T
R
.
.
10 Nm (1.0 m
•
kg, 7.2 ft
•
Ib)
T
R
.
.
10 Nm (1.0 m
•
kg, 7.2 ft
•
Ib)
T
R
.
.
14 Nm (1.4 m
•
kg, 10 ft
•
Ib)
LS
Order
Job/Part
Q’ty
Remarks
Removing the primary and second-
ary sheaves
Remove the parts in the order listed.
Engine assembly
Refer to “ENGINE REMOVAL”.
1
Drive belt cover
1
2
Rubber gasket
1
3
Bearing housing
1
4
Dowel pin
2
5
Primary sheave assembly
1
Refer to “REMOVING THE PRIMARY
AND SECONDARY SHEAVES” and
“INSTALLING THE PRIMARY AND
SECONDARY SHEAVES”.
6
V-belt
1
NOTE:
The V-belt can be replaced even if the
engine assembly is not removed.
www.midwestmanuals.com