Xylem Lowara LS Series Installation,Operation And Maintenance Instruction Download Page 13

Installation, Operating and Maintenance Instruction

                            Model LS, LC, LCP

 

 
 

 

LS 100-english

 

page 11

 

 

Artikel No. 771073402 

 

 

5.2 Connection of Piping to the Pump 

 

 

The pump must not be used as fixed point for 
the piping. The permitted piping loads must not 
be exceeded, refer to chapter 3.5.

 

 

5.2.1 Suction and discharge pipe 

 

The pipes must be of a size and design that liquid 
can flow freely into the pump and that the pump 
functions without problems. Particular attention is 
to be paid to ensuring that suction pipes are 
airtight and that the NPSH values are observed. 
Under suction lift condition lays the suction pipe in 
the horizontal section towards the pump so that it 
is slightly inclined upwards so that no air traps 
occur. Under positive suction head condition 
install the suction pipe work slightly declined 
towards the pump. Do not install fittings or elbows 
right before the suction nozzle. 

 

If the suction supply is under vacuum and 
entrained gas may be present in the liquid, it is 
recommended that a vent line be considered 
upstream of the pump suction with return to the 
suction supply, above the max liquid level. 

 

An additional flushed piping -  discharge branch-
vent line  -  makes it easier to de-aerate the pump 
before start-up (pic 3). 

 

 

 

 

             pic 3 

 

 

When laying the pipes, make sure that the pump 
is accessible for maintenance, installation and 
disassembly. 

 

Notice "Permitted Forces on Flanges" (chapter 
3.5). 

 

If  expansion joints are used in the pipes, they 
have to be supported in such a way that the pump 
is not loaded unduly high because of the pressure 
in the pipes. 

 

Before connecting up to pump: remove protective 
coverings from suction and discharge branches. 

 

Before starting up, the pipe system, fittings and 
equipment must be cleaned to remove weld 
spatter, scale etc. Any pollutants are to be 
completely removed from pump units that are 
directly or indirectly connected to drinking water 
systems before being installed and taken into use. 

 

To protect the shaft sealing (especially mechanical 
seals) against foreign impurities, it is 
recommended that a sieve, 800 micron, is 
installed in the suction/intake pipe when the motor 
is being started up. 

 

If the pipe system is tested with the pump 
installed, do not exceed the maximum permitted 
casing pressure of the pump and/or shaft sealing 
(see data sheet). 

 

When emptying the pipe after the pressure test, 
make sure that the pump is treated properly 
(danger of rust and problems when starting up). 

 

In the case of pumps with stuffing boxes, replace 
packing after pressure test (packing may be over-
compressed and thus no longer suitable for use). 

 

5.2.2 Additional connections 

Any required sealing, flushing or cooling pipe 
connections must be installed. Please consult the data 
sheet to see which pipes, pressures and amounts are 
necessary. The position and size of connections to the 
pump are given in the appendix, "Connections". 

 

 

These connections are essential for the 
function!

 

 

It is recommended that a pipeline is installed to take 
off any leakage from the shaft seal. For connection, 
see appendix, "Connections". 

 

5.3 Coupling 

 

 

Make sure that nobody can start the motor 
during work on the coupling. 
According to Accident Prevention Regulations, 
the pump unit may only be operated when the 
coupling guard is mounted.

 

 

 

On operation in zone 1 and 2 a coupling with 
valid Atex-certification must be used.

 

 

The Operating Instructions of the manufacturer 
must be followed.

 

 

5.3.1 Alignment of coupling 

 

 

The alignment of the coupling must be carried 
out with the utmost care and attention, so that 
the unit will operate without failure. If you do not 
pay attention to this hint you will lose your 
warranty!

 

 

 

 

After mounting onto the foundation and the 
connection of the piping the coupling must be 
adjusted again, even, if the unit was delivered 
completely mounted on the frame.

 

 

 

Before starting installation, carefully clean shaft 
ends and coupling components. 

 

Before adjusting the coupling unfasten  screws 
(S7) between bearing bracket (10) and casing foot 
(80/F) and only fasten again after the adjustment. 
Repeat measurement after fastening of screws 
(S7). 

 

The unit is properly aligned, when a ruler, which is 
laid axially over both coupling halves, has  the 
same distance to the particular shaft everywhere 
on the circumference. Further, both coupling 
halves must have the same distance to one 
another on every of the circumference. This must 

Summary of Contents for Lowara LS Series

Page 1: ...920 en Volute Casing Pumps Model LS LC LCP Installation Operation and Maintenance Instruction Translation of the Original Operation Manual en Keep for further use Pay attention to this operating instr...

Page 2: ...Xylem Service Austria GmbH Ernst Vogel Stra e 2 A 2000 Stockerau Telefon 43 0 2266 604 Fax 43 0 2266 65311 E Mail info austria xyleminc com Internet www xylemaustria com...

Page 3: ...Handling Storage 9 4 1 Transport Handling 9 4 2 Storage Conservation 10 5 Mounting Installation 10 5 1 Mounting of Pump Unit 10 5 2 Connection of Pipings to the Pump 10 5 3 Coupling 11 5 4 Drive 12 5...

Page 4: ...ies to the manufacturer resp orders of spare ATEX Label only for pumps in compliance with EC directive 94 9 EG CE Marking of compliance with the EC directive 94 9 EG Ex specific marking for explosion...

Page 5: ...ir work during the guarantee period may only be carried out by us or subject to our written approval Otherwise the guarantee ceases to apply Longer term guarantees basically only cover correct handlin...

Page 6: ...danger to people or the environment The provisions of the law must be observed Measures should be taken to exclude any danger from electricity e g by complying with the local regulations on electrica...

Page 7: ...n t cause additional increase of surface temperature at the pump Furthermore the references in chapter 6 of these operating Instructions must be taken into consideration On pumps with mech seals the p...

Page 8: ...is is valid for the operation as well as for the standstill of the pump and therefore for all possible pressures and temperatures of the unit 2 8 3 NPSH The pumped liquid must have a min pressure NPSH...

Page 9: ...ng with barrier by pumped fluid P3 Packing with lantern ring with barrier by external fluid P4 Packing with lantern ring with flush P5 Packing without lantern ring with external cooling Position 4 Mat...

Page 10: ...76 0 75 5 76 5 76 5 90 0 77 0 76 5 77 5 77 5 110 0 78 0 77 5 77 0 79 0 78 5 80 0 132 0 79 0 78 5 78 0 79 5 79 5 80 0 160 0 80 0 79 5 79 0 80 5 81 0 80 5 200 0 81 5 81 0 80 5 81 5 82 0 83 0 250 0 82 5...

Page 11: ...200 6000 5400 6700 10450 3250 2300 2650 4800 200 400 250 8350 7450 6750 13050 4450 3150 3650 6550 200 6000 5400 6700 10450 3250 2300 2650 4800 200 500 250 8350 7450 6750 13050 4450 3150 3650 6550 200...

Page 12: ...ufficient firmness acc to DIN 1045 or equal standard min BN 15 to ensure a secure functional mounting The concrete foundation must have set before the unit is erected Its surface must be horizontal an...

Page 13: ...ed in the suction intake pipe when the motor is being started up If the pipe system is tested with the pump installed do not exceed the maximum permitted casing pressure of the pump and or shaft seali...

Page 14: ...available and correct if necessary Pay attention to chapter 6 beforehand It must be possible to turn the unit easily and harmoniously by hand Improper alignment of the unit can lead to damages at coup...

Page 15: ...ty devices are operational Switch on any sealing flushing or cooling devices that are provided See data sheet for quantity and pressure Open valve in suction intake pipe Set discharge side valve to ap...

Page 16: ...valid 6 5 Lubrication of Bearings 6 5 1 Oil lubrication The bearing bracket must be filled up with oil For quality of oil refer to chapter 7 4 1 For quantity of oil refer to chapter 7 4 1 The pumps a...

Page 17: ...ooled down If there is any risk of freezing empty pump cooling areas and pipes completely If the pump also remains under operating conditions pressure and temperature when stationary leave all sealing...

Page 18: ...ure 46 4 mm 2 s 175 C 15 C higher than permitted bearing temperature For ambient temperatures under 10 C another suitable type of lubrication oil must be used Request required Oil quantity Bearing bra...

Page 19: ...isassembled pumps units or single parts against tipping over or rolling off While disassembling the pump use of an open flame blowlamp etc only when there is no danger of setting fire cause an explosi...

Page 20: ...100S Unscrew the hexagon nuts M8 and demount the bearing cover 12 P Loosen and remove the hexagon screws S6 remove the bearing cover 12 Move the shaft 24 with the pair of angular contact bearings K2...

Page 21: ...ng the reverse order of steps as completed for pump disassembly However the following observations should be considered Pay attention to the utmost cleanliness when reassembling the pump For tight tol...

Page 22: ...arings aso 2 To ensure optimum availability we recommend that suitable quantities of spare parts are held in stock especially if these are made from special materials and in the case of mechanical sea...

Page 23: ...liquid level check if suction pipe is vacuum tight Air being sucked in through shaft sealing clean sealing pipe increase sealing pressure replace shaft sealing Direction of rotation is wrong swap ove...

Reviews: