operation:
- Connect filling and bleeding unit.
- Set pressure: 2.0-2.5 bar.
- Wait until the pressure has built up.
- Open bleeder screw at rear left brake caliper.
- Hold bleeder hose tight.
8. If you wish to move to the second phase of operation, press Y
button as instructed.
√ If you do not wish to continue the service, press N button to exit,
and an “Operation failed!” message comes up.
√ You can exit the fluid change service at any phase of the
operation with N button.
9. To complete the second phase of operation, do the following as
instructed:
- Turn off filling and bleeding equipment.
- Wait until the pressure drops.
- Disconnect filling and bleeding equipment.
10. Press Y button to move to next phase.
11. To complete the third phase, do the following as instructed:
- Set pressure: 0.5bar.
- Wait until the pressure has built up.
EPB400 EPB Service Tool User’s Guide
57