Operation Action
Correct pressure can
not be achieved.
[Y]=Enter
[N]=Exit
Operation Action
The EPB requires
removal and
re-assembly.
[Y]=Enter
[N]=Exit
screen shows:
√ View on-screen instruction and then press the Y button to
continue.
EPB400 EPB Service Tool User’s Guide
102