INSTALLATION RESPONSIBILITIES
7
Responsibility
XLT/Service
Owner/
Company
Contractor
Site Survey: Verify electric and gas meter/regulator si7£s
X
Supply wiring from TSl #R3, R4, RS to exhaust fan
X
Supply (1) single phase 230 volt 10 amp circuit from breaker panel to
X
XLT Hood
Assembly of new hood perXLT Installation & Operation Manual
X
Suspend XL T Hood from ceiling
X
Install new exhaust fan on roof
X
Supply power to XL T Hood
X
Install Duct Cover or Valance above XL T Hood
X
Assembly of new ovens perXLT Installation & Operation Manual
Stands assembled and set in place
X
Ovens moved and stacked with proper lifting equipment
X
Assemble shrouds & brackets to XL T Oven/Hood
X
Connecting fuel to XLT products
Install piping and drip le gs
X
Weld ducting to XL T Hood
X
Check for leaks
X
Install flexible gas hoses
X
Collllect electrical supply
X
Connection may require Permit and Code Inspections
X
Relocate Make-Up-Air to enter the room at the ends of the ovens
X
Start-up perXLT Installation & Operation Manual:
X
Gas pressure/leak testing, hood/oven functions, adjust as necessary
X
Start-Up Checklist must be submitted to XL T to validate Warranty
X
Technical Support US: 888-443-2751
S
i
mple
.
Smart.
Technical Support INTL: 316-943-2751