Planning for the installation
Installation Planning Guide
3-2
DocuTech/DocuPrint 75/90 and DocuPrint 75 MX
Customer responsibilities
Your responsibilities prior to, during and after installation of the
DocuTech/DocuPrint 75/90 and DocuPrint 75 MX printers are:
Site Personnel
Identify a person at your site to be the primary interface with
Xerox.
Site Selection and
Preparation
Select and prepare the site for DocuTech/DocuPrint 75/90 and
DocuPrint 75 MX printers installation. The following electrical,
telephone, and network services are required:
Electrical requirements
USA/Canada
The printer requires a dedicated 115V AC 20 Amp grounded
receptacle for the DocuTech/DocuPrint 75. A 208VAC 20Amp,
50/60hz grounded receptacle for the DocuTech/DocuPrint 90.
The power receptacle for the printer must meet the requirements
stated on the data plate on the rear of the printer.
The controller requires a dedicated 115V AC 20 Amp grounded
receptacle.
Europe
The printer requires a a 220-240V 13 or 10 Amp grounded
receptacle for the DocuTech/DocuPrint 75. A 200-240VAC 16
Amp, 50hz grounded receptacle for the DocuTech/DocuPrint 90.
The power receptacle for the printer must meet the requirements
stated on the data plate on the rear of the printer
The controller requires a 220-240V 13 or 10 Amp grounded
receptacle.
NOTE: Power adapter boxes will be available that will allow the
system to be plugged into a 208VAC/30A service in NASG or
200-240VAC/30A in ESG/ACO.
Summary of Contents for Docuprint 75
Page 6: ...TABLE OF CONTENTS iv INSTALLATION PLANNING GUIDE...
Page 12: ...Introduction Installation Planning Guide 1 6 DocuTech DocuPrint 75 90 and DocuPrint 75 MX...
Page 26: ...Safety notes Installation Planning Guide 2 14 DocuTech DocuPrint 75 90 and DocuPrint 75 MX...
Page 48: ...Installation Installation Planning Guide 4 16 DocuTech DocuPrint 75 90 and DocuPrint 75 MX...