background image

 

25 

 

English 

 

A C C E S S O R I E S  

 

Temperature sensor BTC 100 

The  optional  temperature  sensor  BTC  100  measures  the  temperature  of  the  battery 
during  the  entire  charging  process.  Depending  on  the  temperature  measured  the  end 
voltage is compensated. To guarantee that the device is splash proof this option must be 
selected when ordering the device. Important: this compensation must be activated. See 
the chapter ‘Setting the charge program’.  

LCD-monitor PCM 100 

With this monitor it is possible to follow the charging process remotely. The monitor 
displays details such as the battery voltage, charging current, charging phase and any 
errors which may occur. To guarantee that the device is splash proof this option must be 
selected when ordering the device. 
 
 

 

M A I N T E N A N C E  

 
The  charger  doesn’t  need  any  specific  maintenance.  When  cleaning  the  housing,  use  a 
(squeezed)  dry  cloth.  Remove  any  filth  and  dust  from  the  ventilation  openings  of  the 
charger.  Follow  the  instructions  of  the  manufacturer  when  using  and  handling  the 
battery.   
 

Important 

 

Check the charge status of battery charger on a regular basis. 

 

Check the cables and connection between the charger and battery regularly. 

 

Check the ventilation vents on a regular basis. 

 

Check the degree of acidity of a non-maintenance free battery on a regular basis 

 
 
 

W A R R A N T Y   A N D   S E R V I C E  

 

The  TBC  600  chargers  are  marked  with  the  Smart  Value  service  label  of 
Xenteq. This service label gives you additional advantages and certainties 
on service. Read more about this on our website 

 
Before  sending  the  charger  back,  always  advice  the  Trouble  Shooter  and  other 
information in this manual firstly. If a problem could have been solved by means of this 
manual,  we  are  obligated  to  charge  the  repair/research  costs.  In  case  of  a  defect,  the 
charger  can  be  brought  back  to  your  supplier  or  it  can  be  send  to  the  address  on  the 
back of this manual. The charger must be send prepaid. The TBC 600 carries a five-year 
warranty  from  selling  date.  This  warranty  only  covers  the  costs  of  parts  and  labour  for 
the  repair.  The  warranty  period  is  only  valid  when  the  (copy)purchase  ticket  is  handed 
over with the repair. The warranty will lapse when a third party has attempted to repair 
the  charger  or  when  the  TBC  600  is  not  installed  or  used  in  accordance  with  the 
instructions. The only activities that may carried out yourselves is the replacement of the 
input fuse. Do not attempt to repair the charger yourselves. 

The  manufacturer  cannot  be  hold  responsible  for  the  suggested  charge  settings  or  any 
damage resulting from use of the TBC 600. 

Summary of Contents for Profline TBC 600

Page 1: ...TBC 600 Software V1 3 1 Gebruiksaanwijzing NL Blz 2 Users manual GB Page 14 Gebrauchsanweisung DE Seite 26...

Page 2: ...ter bevordering van de gebruiksvriendelijkheid maar uiteraard ook om u evan te verzekeren dat het laadproces veilig verloopt Ompoling Bij ompoling zijn de aansluitdraden voor de plus en de min met elk...

Page 3: ...t aangegeven d m v een error melding Als de lader voldoende is afgekoeld wordt het laadproces automatisch weer vervolgd Het verloop van de hierboven genoemde beveiliging is sterk afhankelijk van de om...

Page 4: ...vens indirect als voeding dienen voor de aangesloten apparatuur Bij het laden van een gedeeltelijk lege accu gaat de stroomafname van de verbruikers dus wel ten koste van de laadstroom voor het laden...

Page 5: ...eer geeft D m v het herhaaldelijk drukken van de mode knop kunt u het juiste laadprogramma ingeven behorende bij het accutype Voorgesteld Accutype laadprogramma GEL AGM NAT fabrieksinstelling SEMI TRA...

Page 6: ...t herhaaldelijk drukken van de mode knop kunt u het juiste laadprogramma ingeven behorende bij het accutype Accutype Voorgesteld laadprogramma GEL AGM CALCIUM AGM SPIRAL Zwaar cyclisch gebruik comp fa...

Page 7: ...rd zijn Dit is belangrijk voor voldoende luchtcirculatie t b v de koeling van de lader en de afvoer van vrij gekomen gassen De TBC 600 is geschikt voor buitenshuis gebruik maar niet direct aan regen o...

Page 8: ...materiaalsoort wordt gebruikt kunnen de bouten zo warm worden dat ze uit de print branden Zorg er ook voor dat de aansluiting van de kabel goed contact maakt anders worden de bouten te warm met kans...

Page 9: ...rden hierin niet meegerekend Tijdens deze fase brandt de gele led onder charge process 3 Compensatie compensate T3 Dit is een speciale en extra laadfase om het sulvaat af te breken wat ontstaat bij re...

Page 10: ...gevallen een nieuw laadproces gestart worden Mocht er bij de start van of tijdens het laadproces een fout geconstateerd worden dan zal er in het display het cijfer van de betreffende fout verschijnen...

Page 11: ...anden Geen handeling onder nemen en het laadproces afmaken Let op Bij meerdere te diepe ontladingen gaat de accu snel defect Error indicatie 3 De boostfase T1 de equalizefase T2 duurt langer dan 14 uu...

Page 12: ...De lader is bezig met de soft start 3 minuten na inschakeling van de lader is de juiste lading waar te nemen Oxidatie van connectors verbindingen tussen lader en accu Controleer de connectors en verva...

Page 13: ...erbindingen Controleer ventilatie openingen regelmatig Controleer het vloeistofniveau bij een niet onderhoudsvrije accu regelmatig GARANTIE EN SERVICE De TBC 600 acculaders worden geleverd met het Sma...

Page 14: ...that the charge process progresses extremely safe Reverse polarisation Reverse polarisation means that the plus and minus connection wires are inadvertently reversed on the battery or on the charger R...

Page 15: ...Level of protection The indication for the degree of protection contains the character IP International Protection followed by two or three digits that stipulates the conditions that it complies with...

Page 16: ...nsumers comes at the expense of the charge current for the battery Stand alone The opposite of on board use There are no users present during the charging process After discharging the battery is conn...

Page 17: ...way of repeatedly pressing the mode button it is possible to enter the correct charging program which corresponds to the battery type Battery type Suggested charge program GEL AGM WET factory setting...

Page 18: ...tedly pressing the mode button it is possible to enter the correct charging program which corresponds to the battery type Battery type Suggested charge program GEL AGM CALCIUM AGM SPIRAL Heavy cyclic...

Page 19: ...enough space around the charger This is important for the air circulation for cooling of the charger and release of gases emitted The TBC 600 may be used outdoors however protect the charger against r...

Page 20: ...e the following procedures Always use the screw nuts and washers brass nickel included When other materials are used there is a risk that the bolt will burn out of the print board Make sure that the w...

Page 21: ...t any thermal stops which may occur During this phase the yellow LED under charging process lights 3 Compensate T3 This is a special and extra phase for breaking down the sulphates which build up when...

Page 22: ...harging process will start When a problem is detected at the start or during the charge process a number will appear in the display which indicates a certain error Consult the Charge Status and Troubl...

Page 23: ...complete Warning If the battery is frequently dis charged too deeply the battery will breakdown quickly Error 3 The boost phase T1 the equalize phase T2 is longer than 14 hours The charging process ha...

Page 24: ...ing on the charger the correct charge level is indicated Oxidation of connectors between battery and charger Check the connectors and replace if necessary Charger doesn t deliver its maximum charging...

Page 25: ...lation vents on a regular basis Check the degree of acidity of a non maintenance free battery on a regular basis WARRANTY AND SERVICE The TBC 600 chargers are marked with the Smart Value service label...

Page 26: ...re Stromquellen gleichzeitig angeschlossen sind beispielsweise ein Sonnenkollektor oder Dynamo Achtung Verbraucher niemals direkt an die Anschlussschrauben des Ladeger ts anschlie en EIGENSCHAFFEN Der...

Page 27: ...m Schutz vor einem berm igen Anstieg der Innentemperatur Bei einer Innentemperatur von ber 70 C schaltet sich das Ladeger t ganz aus Diese Unterbrechung aufgrund von berhitzung wird durch eine Error M...

Page 28: ...Gutachten Pr fen Sie immer ob die empholenen Ladeprogramm entspricht f r Ihren Akku Siehe Seite 38 Falls nicht kontaktieren Sie bitte Ihren Akku Lieferant f r eine andere geeignete Einstellung Verwend...

Page 29: ...odus Knopfes k nnen Sie das dem Akkutyp entsprechende korrekte Ladeprogramm eingeben Akku Vorgeschlagenen Ladeprogramm GEL AGM NASS werkseitige Einstellung HALB TRAKTION TRAKTION CALCIUM AGM SPIRAL Wa...

Page 30: ...n des Modus Knopfes k nnen Sie das dem Akkutyp entsprechende korrekte Ladeprogramm eingeben Akku typ Vorgeschlagenen Ladeprogramm GEL AGM AGM CALCIUM SPIRAL Schwer zyklischer Einsatz compenate an HALB...

Page 31: ...Bel ftungs ffnungen d rfen keinesfalls blockiert sein Dies ist wichtig um eine gute Luftumw lzung gew hrleisten zu k nnen was zur K hlung des Ladeger ts und zur gefahrlosen Ableitung der freigesetzte...

Page 32: ...die mitgelieferten Muttern und Schlie ringe verwenden Messing Nickel Gelangt ein anderes Material zum Einsatz k nnen sich die Bolzen so aufheizen da sie aus der Leiterplatte ausbrennen Au erdem ist si...

Page 33: ...tromanteil Die Dauer dieser Phase betr gt jedoch h chstens 4 Stunden In dieser Phase brennt die gelbe LED 3 Compensate T3 Diese Phase wird nur bei zyklischem Einsatz gebraucht Wenn diese Ladephase ein...

Page 34: ...ng wieder vorhanden ist wird ein neuer Ladevorgang gestartet Sollte beim Start oder w hrend des Ladevorgangs ein Fehler festgestellt werden wird diese mit eine Zahl auf dem Display angezeigt Siehe Anz...

Page 35: ...cheint 5 Minuten lang Nichts unter nehmen und den Lade vorgang beenden lassen Achtung Bei mehreren zu tiefen Entladungen wird der Akku schnell besch digt Error 3 Die Boost Phase T1 Equalize Phase T2 d...

Page 36: ...Das Ladeger t gibt nicht die richtige Spannung und den richtigen Strom ab Das Ladeger t ist im Softstart begriffen 3 Minuten nach Einschaltung des Ladeger tes kann die richtige Ladung abgelesen werde...

Page 37: ...atterie Kontrollieren Sie die L ftungs ffnungen regelm ig Kontrollieren Sie den Fl ssigkeitsstand bei einer nicht wartungsfreien Batterie regelm ig GARANTIE UND SERVICE Der TBC 600 Ladeger te sind mit...

Page 38: ......

Page 39: ......

Page 40: ......

Page 41: ......

Page 42: ...Xenteq BV Banmolen 14 5768 ET Meijel NL Tel 0031 0 77 4662067 Fax 0031 0 77 4662845 www xenteq nl www acculader eu info xenteq nl V1 3 1D...

Reviews: