Locking and Unlocking the Front Panel
975-0200-01-01
5-59
5
4. From the Hyper Terminal (or any other terminal program) select the
Transfer>Send Text File
…
5. Navigate to and select the text file that was previously stored. Click
the Open button.
6. Execute the program recording stop command:
:PROG:STOP
7. Execute the readback command to verify the entire program was
transferred correctly:
PROG:READ?
8. Set the data rate back to the original speed.
9. Close the connection to the HyperTerminal program and configure
the connection data rate to be the original speed.
Running an Auto Sequence Program:
Once an auto sequence program has been stored, there are a few
commands that can be used to run the program. Once a program begins
running, it will continue running until completion and then repeat the
number of times specified by the repeat command. The default at power
on is to have repeat set to 1.
Commands:
*TRG
[:]INITiate[<channel>][:IMMediate]
[:]PROGram[<channel>]:STATe {?|RUN|STOP|PAUSe}
Where:
RUN
causes the program to begin execution.
STOP
causes the program to stop execution
PAUSe
causes the program to stop executing at the current command. If a
subsequent run is sent, the program will resume executing with the next
command in the program.
For Example:
:PROG:STAR
*IDN?
*IDN?
:PROG:STOP
Summary of Contents for XTR 100-17
Page 2: ......
Page 3: ...XTR 850 Watt and 1700 Watt Series Programmable DC Power Supply Operating Manual...
Page 6: ......
Page 18: ...xvi...
Page 48: ...2 18...
Page 122: ...4 30...
Page 208: ...6 20...
Page 244: ...A 36...
Page 250: ...B 6...
Page 264: ...C 14...
Page 272: ...IX 4...
Page 273: ......