![background image](http://html1.mh-extra.com/html/xantrex/pathmaker/pathmaker_owners-manual_3175351010.webp)
10
Diagram 1
(
2 Banks
)
This is the recommended installation method.
In this diagram the
starter is wired directly to the starting battery. The battery switch al-
ways stays in the #1 position, the house battery supplies the DC
loads. The engine starting battery always supplies starting. The
PathMaker connects the batteries in parallel when a charging source
is present and disconnects them when there is no charging source
present.
The battery switch shown is
not required
but may be left installed as
a redundant switch, if desired.
Note: Install Negative (
ground
) to PathMaker last.
Fusing, breakers, wire size, and optional battery switches that may be
required by ABYC or NEC are not shown.
- +
START
+ -
HOUSE
ENGINE
PATHMAKER
STARTER
VB2
VB1
NEGATIVE
1
2
C
TO DC LOADS
+
ALT
TO ENGINE(S)
Summary of Contents for PathMaker
Page 18: ...18...