153379
iii
This manual for use by qualified installers only
About This Manual
Purpose
The purpose of this Planning and Installation Manual is to provide
explanations
and procedures for planning and installing the GT100 Grid-Tied Photovoltaic
Inverter.
Scope
The Manual provides safety guidelines, detailed planning and setup information,
and procedures for installing the inverter.
Audience
Anyone who plans to construct or install a system involving the GT100 Grid-Tied
Photovoltaic Inverter. Installers must meet all local and state code requirements
for licensing and training for the installation of Electrical Power Systems with AC
and DC voltage to 600 volts.
Organization
This Manual is organized into four chapters and one appendix:
Chapter 1, “Introduction” provides information about the features and functions
of the GT100 Grid-Tied Photovoltaic Inverter.
Chapter 2, “Planning” provides information to help plan the installation of the
GT100 Grid-Tied Photovoltaic Inverter.
Chapter 3, “Installation” describes the procedures needed to install the GT100
Grid-Tied Photovoltaic Inverter. This section includes unpacking and moving
instructions, mounting instructions, and cabling instructions.
Chapter 4, “Verification” provides a checklist to ensure the installation of the
GT100 Grid-Tied Photovoltaic Inverter is correct and complete.
Appendix A provides the environmental and electrical specifications for the
GT100 Grid-Tied Photovoltaic Inverter.
Summary of Contents for GT100 Series
Page 1: ...Xantrex GT100 Grid Tied Photovoltaic Inverter Planning and Installation Manual ...
Page 2: ......
Page 8: ...vi ...
Page 16: ...xiv ...
Page 20: ...xviii ...
Page 22: ...xx ...
Page 24: ...xxii ...
Page 66: ...3 16 ...
Page 70: ...4 4 ...
Page 77: ......