![wtw PB 150 Operating Manual Download Page 25](http://html1.mh-extra.com/html/wtw/pb-150/pb-150_operating-manual_1000646025.webp)
Commissioning
25
Setting the
dosing volume
Connecting the suction
hose
4
Close the door to the samples compartment.
5
Open the door to the operating unit.
6
Unscrew the fixing screw (1) of the dosing pipe (2).
7
Adjust the height of the dosing pipe (2) to set the required
dosing volume (between 20 and 350 ml).
2
1
8
Use the fixing screw (1) to fasten the dosing pipe (2).
9
Lay the suction hose from the instrument to the sampling loca-
tion at an incline as otherwise deposits can form in the hose.
10
Secure the intake opening of the suction hose (sampling tube)
in the direction of the flow. This largely avoids any blockage of
the suction opening.
11
Screw the suction hose to the dosage tube.
Direction of flow
Suction hose /
sampling tube
Suction opening
Incline
to
sampler
Summary of Contents for PB 150
Page 1: ...ba74107e03 03 01 Sampler PB 150 Operating manual Sampler PB 150 ...
Page 6: ...List of contents 6 ...
Page 18: ...Overview 18 ...
Page 22: ...Safety 22 ...
Page 30: ...Principle operation 30 ...
Page 50: ...Programming the automatic sampling 50 ...
Page 90: ...Technical data 90 ...
Page 95: ...Appendix 95 11 1 6 Service menu Main menu ...
Page 101: ...Appendix 101 11 4 Dimensions of stationary sampler PB 150 ...
Page 106: ...Appendix 106 ...