1``\YSQdY_^5hQ]`\U
DUSX^Ydb_^D" % GU\T3_^db_\
FUbcY_^F! !Q^TF! !1
$%
'! "$$
$VVLJQ6FKHGXOH
7.
Assign Schedule #4 to make the second weld:
SCHEDULE=4
VALVE=3
;The clamp is still on (SV1). Add
SV2 and energize the gun valve
(SV1+SV2=3).
SQUEEZE DELAY=0
;N/A
SQUEEZE=40
;Give the electrodes time to close
and build pressure. The clamp is
still energized.
UPSLOPE=0 ;N/A
WELD CYC=5
;Weld for 5 cycles
WELD CUR=65%
;Pass 65% of available current.
COOL=2
;65% current for 10 cycles is too
much for this application. Cool it!
IMPULSES=2
;Three layers of metal need plenty
of heat applied slowly. Go back
and WELD again.
DOWNSLOPE CYC=5
;Try cooling the spot slowly, to
prevent cracking.
SLOPE END CUR=20
;N/A
QUENCH CYC=0
;N/A
TEMPER CYC=0
;N/A
TEMPER CUR=0
;N/A
HOLD CYC=10
;N/A
WELD COMPLETE=0
;N/A
SUCCESSIVE SCH=0 ;N/A
CHAIN SCH=5
;Jump to Schedule #5 to eject the
part.
OFF CYC=0
;N/A the sequence jumped to
Schedule #5.
Summary of Contents for Technitron T2050
Page 8: ...D 3_ db_ Ub 2_QbT Qi_ed _TYVYUT DUSX Ydb_ D GU T 3_ db_ Figure 1D 3_ db_ Ub 2_QbT Qi_ed ...
Page 20: ...DXU 4QdQ 5 dbi Q U 45 _TYVYUT DUSX Ydb_ D GU T 3_ db_ Figure 4 45 fUb Qi GD3 _b ...
Page 44: ...BU SQ YRbQdY W dXU D _TYVYUT DUSX Ydb_ D GU T 3_ db_ This page is intentionally left blank ...
Page 52: ...1 YSQdY_ 5hQ U _TYVYUT DUSX Ydb_ D GU T 3_ db_ This page is intentionally left blank ...
Page 54: ... _TYVYUT DUSX Ydb_ D GU T 3_ db_ This page is intentionally left blank ...
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......