$VVLJQ6FKHGXOH
5.
Assign Schedule #2 to make the first spot weld:
SCHEDULE=2
VALVE=3
;The clamp is still on (SV1) add
SV2, and energize the gun valve
(SV1+SV2=3).
SQUEEZE DELAY=0
;N/A
SQUEEZE=40
;Give the electrodes time to close
and build pressure, the clamp is
still energized.
UPSLOPE=0 ;N/A
WELD CYC=8
;Weld time
WELD CUR=65%
;Pass 65% available current
COOL=0 ;N/A
IMPULSES=1 ;N/A
DOWNSLOPE CYC=0 ;N/A
SLOPE END CUR=20
;N/A
QUENCH CYC=0
;N/A
TEMPER CYC=0
;N/A
TEMPER CUR=0
;N/A
HOLD CYC=10
;N/A
WELD COMPLETE=0
;N/A
SUCCESSIVE SCH=3 ;Turn both valves off and wait for
another initiation. On re-initiation,
go to Schedule #3.
CHAIN SCH=0
;N/A (The sequence jumped to
Schedule #3.)
OFF CYC=0
;N/A
Summary of Contents for Technitron T2050
Page 8: ...D 3_ db_ Ub 2_QbT Qi_ed _TYVYUT DUSX Ydb_ D GU T 3_ db_ Figure 1D 3_ db_ Ub 2_QbT Qi_ed ...
Page 20: ...DXU 4QdQ 5 dbi Q U 45 _TYVYUT DUSX Ydb_ D GU T 3_ db_ Figure 4 45 fUb Qi GD3 _b ...
Page 44: ...BU SQ YRbQdY W dXU D _TYVYUT DUSX Ydb_ D GU T 3_ db_ This page is intentionally left blank ...
Page 52: ...1 YSQdY_ 5hQ U _TYVYUT DUSX Ydb_ D GU T 3_ db_ This page is intentionally left blank ...
Page 54: ... _TYVYUT DUSX Ydb_ D GU T 3_ db_ This page is intentionally left blank ...
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......