Assign Schedule #3 to re-clamp the parts with SV1 before the
second spot weld is made:
SCHEDULE=3
VALVE=1
;Energize the gauging clamp SV1.
SQUEEZE DELAY=0
;N/A
SQUEEZE=40
;Give the clamp time to clamp and
align the parts.
UPSLOPE=0 ;N/A
WELD CYC=0
;N/A
WELD CUR=20%
;N/A
COOL=0 ;N/A
IMPULSES=1 ;N/A
DOWNSLOPE CYC=0 ;N/A
SLOPE END CUR=20
;N/A
QUENCH CYC=0
;N/A
TEMPER CYC=0
;N/A
TEMPER CUR=0
;N/A
HOLD CYC=10
;N/A
WELD COMPLETE=0
;N/A
SUCCESSIVE SCH=0
;N/A
CHAIN SCH=4
;The part is now clamped, Go to
Schedule #4. Make the second
weld.
OFF CYC=0
;N/A. The sequence jumped to
Schedule #4.
Summary of Contents for Technitron T2050
Page 8: ...D 3_ db_ Ub 2_QbT Qi_ed _TYVYUT DUSX Ydb_ D GU T 3_ db_ Figure 1D 3_ db_ Ub 2_QbT Qi_ed ...
Page 20: ...DXU 4QdQ 5 dbi Q U 45 _TYVYUT DUSX Ydb_ D GU T 3_ db_ Figure 4 45 fUb Qi GD3 _b ...
Page 44: ...BU SQ YRbQdY W dXU D _TYVYUT DUSX Ydb_ D GU T 3_ db_ This page is intentionally left blank ...
Page 52: ...1 YSQdY_ 5hQ U _TYVYUT DUSX Ydb_ D GU T 3_ db_ This page is intentionally left blank ...
Page 54: ... _TYVYUT DUSX Ydb_ D GU T 3_ db_ This page is intentionally left blank ...
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......