Workrite Ergonomics | 800.959.9675 www.workriteergo.com
3 of 12
Layout Components in Assembly Area
Assemble near final installation location. Once the Workcenter is built it requires at least two people to lift and
move into place. You'll need a large and clean area to assemble. Check your packaged contents against the parts
list on page 1 to verify that you have all the parts needed.
If you have a Workrite Pre-Drilled Worksurface, it may be easiest to assemble on the bottom of the worksurface,
using the pre-drilled holes as a guide.
Place Legs (A), Feet (B & BB), Framesets (C & CC) and Side Bars (D) on the floor or bottom of your worksurface.
Set the Switch (E), Collision Detection Sensor (N) packaged separately, and Power components (G,H,I & J) within
easy reach.
Carefully unpack and arrange all hardware.
Note! You will have many pieces in common and some VERY SIMILAR parts in the Silence Kit, Anti Collision
Kit,Cable Management and Hardware Kit. Use caution!
Note: Your Frameset may look different.
The example shown is an Offset Corner,
Left. If you have an Offset Corner, Right,
your layout will be a mirror of the layout
below. Equal Corner configurations can
be built either way.
1
Third Leg Frameset Hardware
Third Leg Frameset
Two Leg Frameset
Two Leg Frameset Hardware
CDS
Switch
Box 1
Box 2
C
I
I
J
H
K
K
L
L
M
M
G
E
N
D
D
A
A
A
B
B
CC
DD
DD
AA
BB
O
P
R
S
F
R
R
Q
S
S
T
T
U
U
V
M
W
W
X
X
Y
Z