Installation
Greenstar Heatslave II External
ErP -
6 720 813 345 (2014/09)
17
5
Installation
5.1
Unpacking the boiler
Unpacking
It is advised that two or more persons are involved in the transfer of the
packaged boiler from the van to the point of delivery.
▶ Once the packaged boiler has been delivered, the outer carton is
removed first. Care should be taken when releasing the straps. If a
sharp implement is used make sure the outer carton is not pierced
and that the implement is used in such a way so that it may not cause
personal injury. All sharp objects must be covered or the blade
retracted after use and put away in a safe place.
▶ Lift carton up and away from the boiler.
▶ Remove the plastic bag from the boiler and place safely aside.
Fig. 24
5.2
Pipework and flue positions
Safety
All relevant safety precautions must be undertaken. Protective clothing,
footwear, gloves and safety goggles must be worn as appropriate.
Fig. 25
Pipework connections:
▶ Flow;
– 22mm Ø copper 12/18, 18/25 models
– 28mm Ø copper on 25/32 model
▶ Return;
– 22mm Ø copper 12/18, 18/25 models
– 28mm Ø copper on 25/32 model
▶ DCW In 15mm Ø copper.
▶ DHW Out 22mm Ø copper.
▶ PRV 15mm Ø copper.
▶ Services duct 100mm Ø .
▶ Condensate outlet 21.5mm Ø .
▶ Primary drain - hose connection.
All the previous Pre-Installation sections must be read
and requirements met before starting boiler or flue
installation
LIFTING AND CARRYING PRECAUTIONS:
▶ Lift only a manageable weight, or ask for help.
▶ When lifting or putting things down, bend the knees,
and keep the back straight and feet apart.
▶ Do not lift and twist at the same time.
▶ Lift and carry objects close to the body.
▶ Wear protective clothing and gloves to protect from
any sharp edges.
CAUTION:
Ensure there are no pipes, electric cables,
damp proof courses or other hazards before drilling.
6720809437-13.1W
o
260
100
650
794
95
435
105
81
161
670
490
794
650
437
230
105 94 55
528
658
669
705
715
327
650
800
124 90
55
715
698
679
658
670
490
6 720 805 210-04.1TL
Fire valve capillary
& drain access
All dimensions in mm
PRV
PRV
Oil
RIGHT HAND SIDE
LEFT HAND SIDE
Fire valve capillary
& drain access
Condensate
Condensate
Services
Services
Flue
Flue
REAR
PRV
Oil
Condensate
Services
Flue