Installation
Greenstar Heatslave II External
ErP -
6 720 813 345 (2014/09)
19
Fig. 27
▶ Ensure one piece baffle set [C] is in the right location [D], correctly
resting on the baffle rests [F] on either side of the combustion
chamber and pushed securely into place.
Fig. 28
▶ Refit combustion chamber door [A].
5.6
Pipework connections
Fig. 29 Pipe connections
[A]
CH flow 22mm Ø copper (28mm Ø on 25/32 models)
[B]
DHW flow 22mm Ø
[C]
DHW water main inlet 15mm Ø
[D]
CH return 22mm Ø copper (28mm Ø on 25/32 models)
[F]
10mm Ø oil supply connection
[G]
Oil isolating valve (10mm Ø)
[H]
Flexible oil hose*
[J]
Flue manifold condensate outlet
[K]
Condensate outlet and flexible push fit connect (21.5mm Ø) -
supplied
[L]
Condensate pipe - not supplied
[M]
Condensate trap - supplied
[N]
Pressure relief (15mm Ø)
[O]
Drain
[P]
Fixing point for optional return oil pipe
Secure with nuts and washers [B] and tighten until the
chamber door is firmly secured, do not over tighten the
nuts.
6720805209-86.1Wo
B
G
G
G
H
G
A
G
G
12/18 kW Baffle
18/25 & 25/32 kW Baffle
K
J
C
6 720 805 209-13.1TL
D
F
CAUTION:
Isolate the oil & water mains supply before
starting any work and observe all relevant safety
precautions.
6 720 805 209-14.1TL