Configuring Automatic Operation
From the main screen on the unit select Parameter -> Configuration -> Application config. -> Automatic run con-
fig. and configure the
LogicsManager
function "Start req in AUTO" as shown in Figure 4-2 on page 19 to start
the generator in Automatic operating mode if discrete input [DI 02] ("09.02 Discrete input 2") is energized or a
remote start request ("04.13 Remote request" = start via interface) is issued.
Figure 3-3: Example - configuring Start in Auto (LM)
Configuring Emergency Operation
The emergency operation is to be configured that it is initiated if the mains fail for at least 3 seconds or the MCB
cannot be closed.
From the main screen on the unit select Parameter -> Configuration -> Application config. -> Emergency run
config. and configure the following parameters:
ID
Parameter
Value
Comment
2802
On/Off
On
Emergency operation is enabled
2800
Mains fail delay time
3.00 s
Emergency operation is initiated if the mains fail for a t least 3 seconds
3408
Emerg. start with MCB failure Yes
Emergency operation is initiated if the MCB fails to close
Table 3-4: Configuration of emergency operation
Configuring Import/Export Power Control
The power controller is to be configured to use the internal power set point 1, which is to be configured to 0 kW
import power.
From the main screen on the unit select Parameter -> Configuration -> Application config. -> Controller config. -
> Load control config. and configure the following parameters:
ID
Parameter
Value
Comment
5539
Load setpoint 1 source
05.04. Internal pwr. setp.1 The internal power set point 1 is used as load set point 1
5526
Load setpoint 1
Import
The internal power set point 1 is a import power value
5520
Int. load control setpoint 1 0 kW
The internal power set point 1 is configured to 0 kW
Table 3-5: Configuration of import/export power control