Manual 26824
CPC-II Unit Replacement Procedure
Woodward
v
Figure 4-3. CPC-II terminal blocks view (CPC-II cover removed). ...................... 25
Figure 4-4. CPC-II terminal blocks 4 (four) mounting screws localization (CPC-II
cover removed). ............................................................................... 25
Figure 4-5. Unscrewing 2 (two) CPC-II terminal blocks (CCW direction). .......... 25
Figure 4-6. CPC-II wire blocks pulling out. ........................................................... 26
Figure 4-7. CPC-II cable ties cutout. .................................................................... 26
Figure 4-8. CPC-II Ground wire unscrewing. ....................................................... 27
Figure 4-9. CPC-II wires removal from terminal block. ........................................ 27
Figure 4-10. CPC-II conduit nut unscrewing. ....................................................... 27
Figure 4-11. CPC-II cable and conduit removal. .................................................. 28
Figure 5-1. New sealing O-rings installed on hydraulic manifold ......................... 32
Figure 5-2. CPC-II wires inside Electrical Terminal Box ...................................... 33
Figure 5-3. Long socket wrench ........................................................................... 33
Figure 5-4. CPC-II mounting bolts view (bottom of the hydraulic manifold) ......... 34
Figure 5-5. CPC-II mounting bolts tightening (CW direction). .............................. 34
Figure 5-6. CPC-II conduit nut tightening (CW direction). .................................... 34
Figure 5-6. CPC-II wires installation. .................................................................... 35
Figure 6-1. CPC-II with installed RS-232 connection cable. ................................ 36
Figure 6-2. CPC-DX health link (orange switches) in run position and secured
with switching locks (white piece). ................................................... 36
Figure 6-3. CPC-DX with applied electrical power – green LED illuminate. ........ 37
Figure 6-4. Loading the Settings File to the CPC-II device. ................................. 37
Figure 6-5. Basic parameters verification. ............................................................ 38
Figure 6-6. Basic parameters verification. ............................................................ 39
Figure 6-7. Manual Control Mode Enabled. ......................................................... 40
Figure 6-8. Isolation valve OPEN / CLOSED lever position ................................. 41
Figure 6-9. CPC-DX unit with all isolation valves in CLOSED position ................ 42
Figure 6-10. Primary Gain adjustment ................................................................. 42
Figure 6-11. Performance verification on Performance Trend chart .................... 43
Figure 6-12. Performance verification on Performance Trend chart .................... 43
Figure 6-13. Manual Control Mode Disabled. ....................................................... 44
Figure 6-14. Pressure offset value verification between CPC-II units. ................. 45
Figure 6-15. PC Service Tool communication disconnection with CPC-II. .......... 46
Figure 6-16. RS-232 cable disconnection from CPC-II communication port. ...... 46
Figure 6-17. CPC-II cover tightening. ................................................................... 47
Figure 6-18. CPC-II locking clamp tightening. ...................................................... 47