
Manual 26824
CPC-II Unit Replacement Procedure
18
Woodward
Figure 3-1 CPC-II voltage measurement and verification.
Make sure power is off to the CPC-II converter which
to be removed.
TWIN - Terminals system (terminals #15; and 20). Upper screw is used to hold
foreground wire, lower screw is used to hold background wire, see Figure 3-2
below.
Figure 3-2 TWIN - Terminals system handling.
See electric diagram shown on Figure 1.5 and figure 1.6.
During this operation be careful and do not disconnect
running CPC-II connections.