FIREPLACE FRAMING
Firebox framing can be built before or after the appliance is set in place. Construct firebox framing following
Figure 2
and the
chart below for your specific installation requirements.
See Figure 3 on Page 8
for firebox dimensions. The framing headers may
rest on the top of the firebox standoffs.
The firebox may be installed directly on a combustible floor or raised on a platform of an appropriate height. When the firebox
is installed directly on carpeting, tile, or other combustible material, other than wood flooring, the firebox shall be installed on a
metal or wood panel extending the full width and depth of the enclosure.
Stud Location
Recessed Installation
Figure 2 - Framing Dimensions
Do not fill spaces around firebox with insulation
or other materials. This could cause a fire.
G
B
D
Vented through the wall
Inside Chase Installation
Vented through the wall
Vented vertically
B
A
WAR
NIN
G
7
F
A
E
C
A
G
D
G
%
D -
Wall finish material thickness
(see also page 11)
DV
1800
A
41
"
C
44
"
D
0.5"
E
62
"
F
31"
11.5"