![Wood-mizer MP260 Original Instructions Manual Download Page 22](http://html1.mh-extra.com/html/wood-mizer/mp260/mp260_original-instructions-manual_994578022.webp)
Setup
Planer/moulder setup
3
3-3
doc081920
Setup
3.2
Planer/moulder setup
IMPORTANT!
Before starting to use the planer/moulder
you have to meet the following conditions:
Set up the planer/moulder on firm, level ground and level the planer/moulder.
Secure the planer/moulder to the ground to prevent moving during operation.
A cement pad with 12 mm diameter anchor bolts is recommended.
Lock the castors (if equipped).
Indoors the planer/moulder can be operated with the sawdust collection system
only.
The planer/moulder can not be operated when it is raining/snowing and in case
of rain or snow the machine must be stored under roof or indoors.
The planer/moulder can be operated in temperature range from -15
o
C to 40
o
C
only.
The illumination at the operator's position should be at least 300lx
1
.
The planer/moulder’s operator position and E-Stop safety buttons location are
shown below.
1. Light source can not cause stroboscopic effect.
!