
SAWMILL ASSEMBLY
Power Feed Rope Assembly
SAWMILL ASSEMBLY
15doc120709
2-24
2
2.7
Power Feed Rope Assembly
1.
Prepare the cable by closing its ends up with steel caps.
2.
Mount the cable. Install it on the pulley as shown below and secure with clamps (1). Tighten the cable until
the gap between spring coils is .8-1.2 mm.
1
1
0,8-1,2mm
Summary of Contents for LT15 M2 E11S
Page 1: ...Table of Contents Section Page Table of Contents SW 07doc1207091...
Page 2: ......
Page 6: ...6 15doc120709...