First Fire-Up
Hold the ON/OFF key (P2) for 3 seconds until ‘Ignition Started’ appears on the display. The system
will go through each stage for the specified time as per the graph below. The various stages can be
observed from the main screen and other infromation is available through the monitor screens.
As the water temperature in the boiler nears its set point the system should start to modulate
down through the power levels. Once the target temperatue has been reached the system will
enter the Extinguishing stage, Final Cleaning and then rest in Standby until the water temperature
drops by 3C.
It is recommended that a flue gas analysis is carried out to obtain a nominal 12% CO2 at Power 7
adn down to 8-10% CO2 at Power 1. This will ensure a consistant level of combustion and any air
adjustments can be made through the Combustion Fan menu by the adjusting the appropriate
power level fan speed.
Commissioning