10
3062165_201508
General preparations
Layout example:
3 F3 / F3-1 collectors, on end,
alternating pipework (max. 10 collectors)
Flow connector
Return connector
(compulsory for roof integration)
Are all gaskets in place?
Plug
opposite the connectors
Plug
opposite the connectors
M8 x 30
grub screws
at the
bottom of the collectors
Compensators
Sensor well
Layout example:
3 F3-1Q / F3-Q collectors, across, single sided connection on the left
(max. 5 collectors)
Flow connector
Return connector
(compulsory for roof integration)
Are all gaskets in place?
2 x
plugs
opposite
the connectors
M8 x 30
grub screws
at the
bottom of the collectors
Compensators
Sensor well
The following tasks should be carried out
prior to the collectors being moved
onto the roof
.
Please note: Fit compensators only to the short connectors.
• For
single-sided pipework to the left
(see example diagram) the short
connectors are on the right.
• For
single-sided pipework to the right
, rotate the collector through 180°.
The short connectors are now to the left.
• For
alternating pipework
, ensure that all short connectors are facing in the
same direction.
Prior to joining the connections, check whether the collector gaskets are inside
each fitting.
When fitting the connection pieces, compensators and plugs, always
counter
hold
the union nut on the collector tightly. Apply a maximum torque of 20 Nm.
Remove the sensor well from the control unit carton and insert it into the flow
connector.
Respectively insert 2 M8 x 30 grub screws fully into the lower tray edge.
Preparations prior to installation
Compensators
Grub screws M8 x 30
Flow connector
Collector gaskets
Sensor well
Return connector (compulsory for
roof integration)
Long
connector
Short
connector
Summary of Contents for TopSon F3-1