
5
3061809_1210
Installation / Electrical work
Join the power supply cable to the plug supplied. Insert the plug
into the marked-up location in the plug-in connector strip, and
secure the cable with its strain relief. Route the cable through the
boiler back cutout.
Power supply connection
Electrical work
Mains
230
V
LP
=
Primary
pump
A1
=
Programmable
output
KKP
=
Boiler
circuit
p
ump
eBUS
E1
=
Programmable
input
SF
=
Cylinder
sensor
AF
=
Outside
temp.
sensor
When installing this control unit ensure that sensor capillaries are
neither kinked nor twisted.
Never route on-site sensor and remote control leads / cables
together with mains power cables.
Implement the electrical wiring in accordance with the wiring
diagram.
Open the rear control unit cover after releasing both screws.
Burner supply cable
Guide it through the aperture in the control unit bracket (l.h. / r.h.),
subject to the side to which the boiler door opens.
Boiler sensor
Insert into any opening of the boiler sensor well.
High limit safety cut-out
Insert sensor capillaries into any opening in the boiler sensor
well.
Earth terminal
Insert into the control unit panel.
Thermometer for boiler water temperature display
Insert into any opening of the boiler sensor well.
Installation
Burner supply cable
Boiler sensor
High limit safety
cut-out
Earth terminal
Thermometer
Insert all plugs that are not used into the plug-in strip. Observe
the colour coding.
Info
Summary of Contents for R1
Page 36: ...3061809_1210 36 ...