19
3062815_0110
13. Roof integration, interlocking tile
1. Centre the mounting rail after fitting the extension, so that a gap of 0.5 - 12 cm (dim. "X") is created between the
collector array width and the final cover. Where dim. "X" cannot be achieved, use half tiles or cut tiles to size.
Dim. "X" must be achieved to ensure a cover that is safe from the ingress of rain.
2. Drill a Ø 5 mm hole and secure the mounting rail with the hexagon head cap wood screw 8x80 and the timber
spacers (batten thickness less 9 mm) to the rafters.
3. Affix the flashing tape in accordance with the diagram. For this, remove the protective foil only in the area actually to
be used for the mounting rail. The flashing tape must protrude approx. 35 cm on the left and right over the flashing
tape bases. Secure several flashing tapes to each other with an overlap of at least 5 cm. (Do not as yet affix the
flashing tape to the tiles as the collectors must still be secured to the mounting rail.)
Installation and extension
of the lower mounting rail
(with return for flashing tape)
Flashing tape
base, L.h.
Flashing tape base, R.h.
Connecting rail
Mounting rail for
2 collectors (2.26 m)
Mounting rail for
1 add. collector (1.13 m)
2 x coach bolt
M8 x 16
4 x coach bolt
M8 x 16
8 x 80
Timber spacer
(batten thickness less 9 mm)
Overlap > 5 cm
Mounting
rail
Flashing tape
Construction
Timber spacers in the thickness of the battens
Triangular sealing tape
Top panel
Collector
Timber spacers in the thickness of
the battens less 9 mm
Mounting rail
Flashing tape
Waterproof subroof
Recommendation:
Stuff the space below the
top panel at the tile contact
point to prevent the tile from
pushing through.