Shutting down
Original-Betriebsanleitung
HD1+HD2
22
•HD1-2_BAoDB_en_1407•ski
9.
Close the injection lance.
10.
Turn back the air regulator by turning the the control screw to the left until it
moves freely. The pressure gauge must show 0 bar.
11.
Close the air tap lock.
12.
Re-open the injection lance shortly to release any remaining pressure from
the system.