Translation of the original operation manual
HERKULES PFP
31
HERKULES PFP_BAoDB_en_1402_B · rs
Operation
1.
Unscrew the material outlet and the
drain hose.
2.
Drain the release agent (Mesamoll)
into a catch container.
3.
Unscrew the nuts on the 6 threaded
bolts (see Fig. 20).
4.
Pry the pressure cylinder from the
spring housing using a pry bar or
screwdriver (see Fig. 21).
Fig. 20: Unscrew the nuts on
the threaded bolts
Fig. 21: Pry the pressure cylinder
from the spring housing
Fig. 22: Pry the spring housing
from the HP-head
5.
Pry the spring housing from the HP-head
(see Fig. 22).
6.
Lower the dual piston to its lowest position
using brief increases and decreases in the
air pressure.
7.
Pry the intermediate body from the air mo-
tor. It will be caught by the dual piston.
8.
Unscrew 2-3 of the threaded bolts to allow
removal of the HP-head and the dual pis-
ton from the coupling (see Fig. 23).
9.
Clean the piston, piston valve, bottom
valve, pressure cylinder, intermediate
body, spring housing, threaded bolts and
nuts thoroughly using solvent.
Fig. 23: Remove the HP-head
and the dual piston
from the coupling
Take care that the dual piston, packings, seals and threads are not damaged.