34
Translation of the original operation manual
HERKULES PFP
HERKULES PFP_BAoDB_en_1402_B · rs
Maintenance
6.2 Maintenance plan
The information in the maintenance plan is a recommendation. The inter-
vals may vary in dependence on the condition of materials used and outer
influences.
Interval
Activity
before each start-up
Check the lubricant level in the fog oiler
before each start-up
Check the release agent level in the fluid pump
1 x per week
Check and adjust the fog oiler
1 x per week
Check and clean the water separator
every 50 operating hours
Check release agent of the fluid pump for mate
-
rial residues
6.3 Maintenance unit
Fig. 25: Maintenance unit
1
2
3
4
5
6
7
8
No. Designation
1
Fog oiler adjusting screw
2
Inspection glass
3
Oil filler plug
4
Locking slide
5
Oil tank
6
Water separator
7
Drain valve
8
Drain hose
6.3.1 Check the lubricant level in the fog oiler
The unit must only be commissioned if the oil reservoir of the fog oiler con-
tains enough oil. In case of high humidity, use antifreeze for lubrication to
avoid icing of the air motor
.
Check the lubricant level every day as follows:
1.
Press up the locking slide on the oil reservoir and unscrew the oil reservoir
by turning it anti-clockwise.
Take care of the O-ring that seals the oil reservoir. It may be displaced or
even fall out at dismantling
.
2.
Check whether the O-ring fits correctly – if necessary, fit it correctly.