30
Original operation manual
2K GEL UNIT
2KGel_14025_25015_BAoDB_en_1701 • rs
Operation
5.8 Material change
The machine has been specially configured for your application case. It is
necessary to check compatibility of the materials used with other materials in
each individual case. WIWA is happy to help determine the suitability of your
machine for another material.
1.
Clean the machine completely according to chap. 5.7 on page 29.
2.
Put the machine into operation with the new material according to chap. 5.1
5.9 Decommissioning
Shut down the machine when there is a longer work interruption. For the exact
time specification of how long the unmixed material can remain in the machine,
please take the recommendations of the material manufacturer.
To do so, proceed as follows:
1.
Interrupt work according to chap. 5.5 on page 28.
2.
Clean the machine completely according to chap. 5.7 on page 29.
5.10 Replacing the attachment kits
WARNING
Disassembling machine parts that are under pressure can cause serious
bodily injury and injuries to the eyes.
So that the safety of the operating personnel and the machine is not
endangered:
➤
Conversion measures may only be carried out by trained personnel!
➤
The machine must be shut down according to chap. 5.9 on page 30.
5.11 Disposal
It is necessary to collect residues of spraying material, cleaning fluids, oil,
greases and other chemical substances according to the legal regulations for
recycling or disposal. The official local waste water protection laws apply.
At the end of the machine's use it must be put out of use, disassembled and
disposed of according to the legal regulations.
➤
Thoroughly clean the machine of material residues.
➤
Disassemble the machine and separate the materials - metals must
be taken to a scrap metal depot, plastic parts can be disposed of with
household waste.