Home Lift - Elevating platform 

 

Test instructions 

 

 Subject to change without notice!

 

EXCELLENCE IN COMPONENTS

 

Date 

 

07/10/2011 

Sheet 

 

Version 

 

11117320015V02 

Approved   

ISC

 

 

Original instructions 

 

leaflet  enclosed  as  Annex  1  for 
using 

lifting 

platforms 

for 

conveying  passengers  also  refers 
this to. 

 

Beyond  the  operating  instructions, 
please  also  bear  in  mind  the 
generally 

applicable 

national 

statutory 

and 

miscellaneous 

regulations on accident prevention 
and  environmental  protection.  The 
assembly  instructions  should  also 
include 

special 

operating 

conditions 

such 

as 

work 

organization,  company  processes 
and  staff.    Finally,  please  comply 
with the supervisory and reporting 
obligations  and  instruct  your 
employees to comply with them as 
well. 

 

3.1.1. Safety principles 

 
The complete lifting platform system has been 
design  tested  pursuant  to  EN81-41  and 
Machine  Directives  98/37/EC  and  2006/42/EC.  
Wittur  cannot  accept  any  warranty  for  safety 
components and parts not included in Wittur's 
scope  of  delivery  or  for  the  way  they  mesh 
with Wittur's component in the system. 
 
This  lifting  platform  is  state-of-the-art  and 
built  according  to  the  recognised  safety  rules 
for  lifting  platforms.  Nevertheless,  there  may 
be  hazards  to  life  and  limb  of  users  or  third 
parties  or  the  lifting  platform  or  other 
property  may  be  impaired  if  it  is  not  used  as 
intended. 
 
The lifting platform should only be operated as 
intended  in  flawless  technical  condition 
following  the  operating  instructions.  Please 
also  be  safety-conscious  and  aware  of 
potential  hazards.  The  assembly  company  or 
service 

company 

should 

eliminate 

malfunctions that could impair safety. 
 

Hazard from damaged components: 

 

The  lifting  platform  should  be  shut  down  if 
there  are  malfunctions  that  cause  the  lifting 
platform  to  move  in  an  unintended  fashion, 
that  cause  the  load  suspension  device  or 
counterweight  to  fall,  if  the  door  safeties  fail 
or if there is a fire in the platform well or drive 
room.  Only  put  the  lifting  platform  back  into 
service  when  an  expert  has  checked  the 
platform or the components affected to see if 
they  are  in  proper  condition  and  has  issued  a 
certificate on the results. 

 
Shut  the  lifting  platform  down 
with malfunctions 

 
Follow this procedure: 
- Everyone has to leave the car. Then check to 
see whether there are passengers in the car. 
-  ensure  that  the  car  cannot  be  switched  on 
again. 
- after shutting the lifting platform down and 
securing the hazardous area, notify the service 
company immediately. 
- put signs on the platform well doors to warn 
people that the lifting platform is shut down. 
 

3.1.1.1.  Malfunctions  with  an  impact  on 
safety 

 
Malfunctions  have  an  impact  on 
safety if: 
 

- The car starts while a shaft door is open 
- The shaft door can be opened when the car is 
outside of the unlocking zone of this door. 
-  The  car  starts  up  when  the  car  door  is 
opened. 
- The lifting platform does not have its normal 
stopping levelling at the stops. 
-  The  emergency  call  equipment  does  not 
function  and  the  signs  on  the  main  entrance 
are not legible. 
- The glazed shaft walls, shaft doors, car doors 
or the car itself are damaged. 
-  The  emergency  brake  switch  or  the  door 
open switch does not function. 
 

Summary of Contents for HHL-W Line

Page 1: ...Home Lift Elevating platform Test instructions Subject to change without notice EXCELLENCE IN COMPONENTS Date 07 10 2011 Sheet 1 Version 11117320015V02 Approved ISC Original instructions...

Page 2: ...urpose and scope of application of these instructions 2 Designations and terms 3 Safety advice 4 Description 4 1 Planning and measuring equipment 4 2 Failures Evaluation 4 3 Test methods 4 3 1 General...

Page 3: ...for braking and holding the car if it is travelling with over speed or if the suspension ropes break Pit The part of the well below the lowest stop that the car stops at Drive Equipment that moves and...

Page 4: ...lease also be safety conscious and aware of potential hazards The assembly company or service company should eliminate malfunctions that could impair safety Hazard from damaged components The lifting...

Page 5: ...ation shall be Negative N when the failure represents a serious risk for the user s safety In the relative report see Annexes 1 and 2 to the N qualified points there must be the failures to repair or...

Page 6: ...Both machine room door and machinery cabinet door must open on the outer direction Ventilation The machine rooms and cabinets must have enough ventilation outlets In case of machinery cabinets these...

Page 7: ...peed for not exceed 0 15 m s timing the platform travel from the lowest to the higher position and vice versa so that it does not exceed the amount t sec t sec travel m 0 15 m sec Unscrew the screw n...

Page 8: ...occur 4 3 4 Controller Cabinet fixing Check that the controller cabinet has the suitable fixings to the machine room walls or the machinery cabinet General connections Check that the connections on th...

Page 9: ...case of power supply failure Alarm Check the correct acting of the alarm button and the telephone system According the EN81 41 check that the phone line is in perfect condition and that the outgoing...

Page 10: ...ater Hinged support This item will only be necessary for verification when the systems if fitted with a hinged support for ensuring the security space in the pit Check the rigidity of the hinged suppo...

Page 11: ...he device D The disengaging of the safety gear will be carried out manually placing again the safety clevis This operation will be carried out from the pit safely because the lifting platform is engag...

Page 12: ...inal examinations and tests before putting into use the platform The Installation Company is the responsible of doing this final test or contracting a Notified Body to do it according to this procedur...

Page 13: ...f the examiner examination certificate examination N 1 Category type and make or trade name 2 Manufacturer s name and address 3 Name and address of certificate holder 4 Date of submission for examinat...

Page 14: ...instructions Subject to change without notice EXCELLENCE IN COMPONENTS Date 07 10 2011 Sheet 14 Version 11117320015V02 Approved ISC Original instructions Annex 2 Check list form sample Take the follo...

Reviews: